Laserfiche WebLink
burton hersh <br />A R C H I T E C T U R E I P L A N N I N G <br /> <br />Burton Hersh, PA I 130 Miracle Mile #200 I Coral Gables, FL 33134 I T 305.446.4877 I AA 26001651 I www.burtonhersh.com <br /> <br />January 8, 2016 <br />Mr. Gregory Yu, <br />Skyy Properties, Inc <br />6435 SW 100th Street <br />Miami, FL 33156 <br /> <br />Via: Email: resking@aol.com <br /> <br />Re: 2728 Ponce de Leon Blvd, Coral Gables Florida <br /> <br />Dear Mr. Yu: <br /> <br /> This document shall constitute the agreement between Skyy Properties, Inc., hereinafter referred to as “Owner” and the <br />Architect, Burton Hersh, PA, hereinafter referred to as “BHPA”. <br /> <br />I. The Project: <br />A. BHPA shall provide a 40 Year Building Certification of the existing conditions for submission to the City. <br />B. Renovate the existing building at 2728 Ponce de Leon Boulevard. The renovation shall be a shell for 2 Restaurants. <br />One shall have 200 seats including exterior seating under a permanent roof. The smaller restaurant should be <br />approximately 1,800 square feet of space. <br />C. The Renovation shall retain the Easterly approximately 2590 square foot building and demolish the Westerly 2980 <br />square foot building. <br />D. If possible add up to 1000 additional square feet and the parking to support it. <br />E. Investigate a roof terrace. <br /> <br />II. Basic Services: <br /> <br />A. Schematic Design and Visualization Phase: <br />1. BHPA shall provide a 40 Year Certification for the Structure and Electrical to be submitted to the City. <br />2. BHPA shall prepare a 3 Dimensional model, floor plans and elevations for approval of the City and the Owner. <br />3. BHPA shall represent the Owner for the Coral Gables Board of Architects and the Zoning Department. <br /> <br />B. Construction Documents Phase: <br />1. Based on the approved Design Documents BHPA shall prepare, for approval by the Owner, Construction <br />Documents consisting of drawings with specifications setting forth in detail the architectural, interior design, <br />structural engineering, electrical engineering, plumbing engineering and mechanical engineering requirements <br />for construction of the Project and acquisition of a master building permit. <br />2. BHPA shall provide signed and sealed construction documents to the Owner for application of a building permit. <br /> <br />C. Bidding and Negotiation Phase: <br />1. BHPA shall respond to Requests for Information from bidders or the Owner’s selected Contractor. <br />2. BHPA shall assist the Owner with the permitting process by responding to comments from the governing <br />municipality and making adjustments required by them for compliance with the governing building codes and <br />coordinate with the Owner’s Permit Processor. <br /> <br />D. Construction Phase: <br />1. BHPA shall provide administration of the Contract for Construction as set forth in the Contract for Construction <br />(AIA Document A201, General Conditions of the Contract for Construction, current as of the date of this <br />Agreement) and as provided in this Agreement. <br />2. BHPA shall visit the site as necessary to become generally familiar with the progress and quality of the work <br />completed and to determine in general if the work is being performed in a manner indicating that the work when