Laserfiche WebLink
Local Continuing ContractsMaster Consulting Engineers, Inc. <br />Extreme Engineering | Incredible Results <br />Name of Contract Duration Scope of Services Amount <br />City of Delray Beach Started: 08/31/2017 <br />5 Years - Reserves <br />the right for one, <br />2-year term. <br />Provide structural design services on a <br />continuing contract basis for the City of Delray <br />Beach. <br />Service Authorizations <br />of no more than <br />$200,000 each. <br />City of Miami Started: 05/02/2018 <br />2 Years - Option to <br />extend the term for <br />2 additional periods <br />of 1 year each. <br />Provide structural design services, construction <br />documents, scheduling, estimating, <br />construction administration, and reporting. <br />New construction, remodeling/renovation, <br />and building assessment of community <br />centers, fire stations, marinas, aquatic facilities, <br />parks facilities, and public safety facilities for <br />governmental, institutional or recreational <br />projects. <br />The amount of <br />compensation shall not <br />exceed Five Hundred <br />Thousand Dollars <br />($500,000) in total <br />over the term of the <br />Agreement. <br />City of Miami Beach Started: 02/05/2019 <br />3 Years - Two, 1 year <br />renewal options <br />Engineering Services in Specialized Categories <br />On An “As-Needed-Basis” for small repairs, <br />remodels, or renovation projects. <br />Service Authorizations <br />of no more than <br />$325,000 <br />City of Miramar 3 Years - One 3 year <br />renewal option, <br />at the City’s sole <br />discretion. <br />Services may include but may not be limited <br />to design, construction documents and <br />construction management for new and existing <br />facilities. <br />Specific Amount not <br />Stated <br />F. Firm References and Similar Work Completed