My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
William Lane Architect, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
William Lane Architect, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 12:06:49 PM
Creation date
8/21/2020 12:06:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT <br />KEY NUMBER <br />2 <br />21. TITLE AND LOCATION (City and State) <br />Miami-Dade County Stephen P. Clark Center Government Building ADA <br />Analysis <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br /> <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER <br /> <br />b. POINT OF CONTACT NAME <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />Miami-Dade County Hugo Velasquez, ISD Resiliency Officer (305) 375-4813 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />The scope of work included an analysis of all public spaces in the 32 story Stephen P. Clark Center Government Center per <br />ADA Title ll compliance. The 85 page written and illustrated study included documentation of existing conditions and contexts, <br />barrier removal identification, standards necessary to meet compliance, financial/ budget analyses, as well as the programing <br />and scheduling of improvements over a staged 9 years period based on level of priority. Services provided: space planning, finish <br />and furniture specifications, ADA upgrades, A/V improvements, and design development. <br /> <br />Size: 32 story building – public spaces <br />Cost: $1.5m construction budget <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> <br />a. <br />(1) FIRM NAME <br /> <br />William lane Architect, Inc. <br />(2) FIRM LOCATION (City and State) <br />Miami, FL <br />(3) ROLE <br /> Architect
The URL can be used to link to this page
Your browser does not support the video tag.