My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Synalovski Romanik Saye LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Synalovski Romanik Saye LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 11:34:48 AM
Creation date
8/24/2020 11:32:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
48 <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, If not specified. Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br /> 9 <br />21. TITLE AND LOCATION (City and State) Sunrise Public Works Facility - Sunrise, FL 22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ph1 – 2008, Ph2 - 2012 <br />CONSTRUCTION (if Applicable) <br />Ph1 – 2009, Ph2 - 2013 <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br /> City of Sunrise <br />b. POINT OF CONTACT NAME <br /> Alan Gavazzi – Asst. Dir. Comm. Develop. <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />954.572.2487 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />In designing a new multi-departmental public services complex for the City of Sunrise, a primary challenge was to allow each <br />department’s connectivity to the whole while enabling them to operate separately. Their differin g hours of operation and varying <br />levels of security were carefully considered in the site plan to balance strategic accessibility with maximum protection. The buildings <br />include: Public Works (16,440 SF), Leisure Services (8,356), Fleet Maintenance (18,648 SF), Fueling Station (4,728 SF), and <br />Trash Transfer Station (5,508 SF). Each department’s functional, equipment, and material storage needs were thoroughly <br />assessed. A tilt-up wall system was utilized for cost- and time-effectiveness. Our firm monitors onsite construction progress, ensuring <br />quality control throughout. The 51,000 SF project was budgeted at $7.5 million. The Fueling Station was completed in the last quarter <br />of 2009. The remainder of the project was completed at the end of 2013. <br /> <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br /> <br />Synalovski Romanik Saye, LLC <br />(2) FIRM LOCATION (City and State) <br /> Fort Lauderdale, FL <br />(3) ROLE <br /> Architect <br />b. <br />(1) FIRM NAME <br /> Saad El- Hage Consulting Engineers <br />(2) FIRM LOCATION (City and State) <br /> Fort Lauderdale, FL <br />(3) ROLE <br /> <br />Structural Engineer <br />c. <br />(1) FIRM NAME <br /> . <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br /> <br />d. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />e. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br />
The URL can be used to link to this page
Your browser does not support the video tag.