My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Synalovski Romanik Saye LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Synalovski Romanik Saye LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 11:34:48 AM
Creation date
8/24/2020 11:32:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
55 <br />Charlotte J. Burrie Civic Center <br />With enthusiastic approvals by the Planning and Zoning Department and the Architectural <br />Appearance Board of the City of Pompano Beach, the 8,712 SF center is on a course to <br />address community needs long championed by City Commissioner Charlotte J. Burrie. The <br />Center is designed with multipurpose meeting spaces for civic, social, and recreational <br />activities, easy pedestrian access with ADA compliance, porte cochere entrance for <br />inclement weather protection, and 48 vehicular and 20 bicycle parking spots. Interior <br />floor plans feature reception area and administrative offices; small conference room; <br />assembly spaces for classes or meetings; large multipurpose room to offer table seating <br />for 125, or theater style seating for 250, as well as a performance stage; and a warming <br />kitchen, restrooms, and storage areas. <br />Client City of Pompano Beach <br />Services Programming <br />Site Plan Approval <br />Architectural Design <br />Construction Documents <br />Interior Design <br />Permitting <br />Contract Administration <br />Status <br />Success <br />Contract <br />Duration <br />Contact <br />Completed February 2020 <br />Social and civic needs of the <br />residents of Pompano Beach, <br />and the Cresthaven community <br />in particular, will be served by a <br />brand-new facility, signaled by <br />a strong “main street” one-acre <br />presence on Federal Highway. <br />$4,498,475 <br />18 Months <br />Mr. Hector Gandia <br />Engineering Project Manager <br />1201 NE 5th Avenue, <br />Pompano Beach, Florida 33060 <br />954.786.5520 <br />hector.gandia@copbfl.com Seeking <br />LEED Silver <br />Play
The URL can be used to link to this page
Your browser does not support the video tag.