Laserfiche WebLink
<br /> RFQ-20-07-01 <br />Continuing Professional Consulting Services (CCNA) <br /> <br /> 790 NW 107 Ave., Suite 200, Miami, FL 33172 <br /> Tel:(786) 456-7700 (954) 658-5232 5 <br /> <br />D. PROJECT APPROACH AND UNDERSTANDING <br /> <br />CALTRAN’s experience and expertise will be put to the City’s service and will become the most reliable consultant to <br />fulfill the engineering assignments that include investigation, analysis, evaluation, coordination, preparation of plans, <br />specifications and contract documents, bid/awards and evaluation services during construction, perform construction <br />engineering services and any other engineering assignments upon the request of the City. <br /> <br />CALTRAN is highly qualified, experienced and extremely interested in providing the following services in connection <br />to Scope of work 2- Civil Engineer and 10- Construction Engineering and Inspection (CEI) Services categories <br /> <br />Civil Engineer Category: As per the scope requested, CALTRAN has extensive experience in feasibility studies, <br />planning, design, construction documents preparation, bidding services, construction administration and inspection <br />services, cost estimate, permitting and other consultation engineering services for the City’s Civil Engineering projects <br />to be in compliance with Federal, State and local regulatory Agencies. <br /> <br />Construction Engineering and Inspection (CEI) Category: CALTRAN will be able to perform all tasks related to <br />the contract administration, monitoring and inspection to ensure that projects are constructed in accordance with plans, <br />specifications and special provisions as established in the Construction Contract. Provide general consultation and <br />engineering services including but not limited to field inspections, structural analysis, reports, and recommendations <br />for field conditions of the City’s facilities <br />Project Administration and Contract Management <br /> <br />CALTRAN’s administration and management of this contract is based on the following elements: <br /> Complete understanding of the technical requirements and <br />focus in a single area of interest. <br /> Objective to supply and expedite concurrent or multiple <br />activities. <br /> Organized to provide flexibility. <br /> Experienced staff to resolve unique issues through the most <br />innovative solutions. <br /> Staff that will be available day/night to meet with City of Sunny <br />Isles staff and stakeholders at their request. <br /> First hand access to state-of-the-art technology. <br /> Sheer resolution and commitment to serve the City of Sunny Isles. <br /> <br />CALTRAN acknowledges that the City of Sunny Isles challenges require a consultant with capacity and knowledge to <br />quickly respond and to solve problems related to Civil Engineering and Construction Engineering Services. <br />CALTRAN’s previous work on similar contracts will efficiently convey ideas, perform assessments, as well as, produce <br />reports, memoranda and analysis for the City of Sunny Isles that could encompass the following aspects of our <br />management plan: <br /> <br />Being this Continuing Professional Consulting Service Contract (CCNA) are Purchase Orders (PO) / Task Work Order <br />(TWO) oriented contracts that entails addressing civil engineering assessments, development of plans for construction, <br />as well as to perform CE&I including contract administration. This type of contract currently has four critical challenges <br />that includes but not limited to serve on on-call to fulfill staff, city officials or general public requests, planning and <br />communication, management of task work orders and respond during the Covid-19. <br /> <br />On-Call Services This contract poses increased challenges as it not only a consultant that will be utilized as needed, <br />on-call or on a part time basis for either civil engineering tasks or construction inspections. This can be challenging <br />fulfilling requests in a timely manner without impacting the City’s project schedule and work program plans. Our firm <br />understands and can guarantee that the depth of our staffing resources and the versatility of our team. We also have <br />a record of staff continuity that has being cross-trained and can be utilized on concurrent assignments <br />