My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 20-08-01 City Landscaping Services (With Hyperlink to Option B)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(20-08-01) City Landscaping Services (With Hyperlink to Option B)
>
ITB 20-08-01 City Landscaping Services (With Hyperlink to Option B)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2020 3:59:37 PM
Creation date
8/27/2020 3:58:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br />City of Sunny Isles Beach | ITB 20-08-01 City Landscaping Services 94 <br /> <br />Subtotal Section “F” Lines No. 128 – 140 <br /> <br />$ <br /> <br />G. LABOR <br />141 <br />G1 One Landscape Superintendent <br />100 Hours <br />(8am – <br />5pm, M-F) <br /> <br /> <br />$ <br /> <br /> <br /> <br />$ <br />142 <br />G2 One Landscape Superintendent <br />100 Hours <br />(All other <br />times) <br /> <br /> <br />$ <br /> <br /> <br /> <br />$ <br />143 <br />G3 One Landscape Laborer <br />100 Hours <br />(8am – <br />5pm, M-F) <br /> <br /> <br />$ <br /> <br /> <br /> <br />$ <br />144 <br />G4 One Landscape Laborer <br />100 Hours <br />(All other <br />times) <br /> <br /> <br />$ <br /> <br /> <br /> <br />$ <br />145 <br />G5 One Irrigation Specialist <br />75 Hours <br />(8am – <br />5pm, M-F) <br /> <br /> <br />$ <br /> <br /> <br /> <br />$ <br />146 <br />G6 One Irrigation Specialist <br />50 Hours <br />(All other <br />times) <br /> <br /> <br />$ <br /> <br /> <br /> <br />$ <br />147 <br />G7 One Irrigation Laborer <br />75 Hours <br />(8am – <br />5pm, M-F) <br /> <br /> <br />$ <br /> <br /> <br /> <br />$ <br />148 <br />G8 One Irrigation Laborer <br />50 Hours <br />(All other <br />times) <br /> <br /> <br />$ <br /> <br /> <br /> <br />$ <br />Subtotal Section “G” Lines No. 141 – 148 <br /> <br />$ <br /> <br />H. EQUIPMENT <br />149 <br />H1 One Front End Loader with Backhoe, <br />including an Operator (Hourly Rate) 5 Hours <br /> <br /> <br />$ <br /> <br /> <br /> <br />$ <br />150 <br />H2 One Front End Loader with Backhoe, <br />including an Operator (Daily Rate) 5 Days <br /> <br /> <br /> <br /> <br /> <br />$
The URL can be used to link to this page
Your browser does not support the video tag.