Laserfiche WebLink
Clty of Sunny lAes Reach I IT6 18-a3-02- Pa rks and Recreational Facilities Lundscape Maintenance Services <br />so Hours <br />H6 <br />One Irrigation Specialist <br />(All other <br />75 Hours <br />H7 <br />One Irrigation Laborer <br />Pm, — <br />163 50 Hours <br />HS One Irrigation Laborer (All offier <br />ab <br />X. EQUIPMENT <br />164.7 <br />One Front End Loader With Backhoe, <br />5 Hours <br />Including an Operator (Hourly Rate) <br />55.00 <br />275.00 <br />165 <br />One Front End Loader With Backhoe, <br />5 cays <br />Including qn Opeiator (Daily Rate) <br />450.00 <br />$2,250.00--_ <br />166 <br />7 <br />F <br />' One, J5,000 GVW (or larger) Dump Truck <br />5 <br />225-00 <br />13 <br />with art Operator (Hourly Rate) <br />$ 45.00- <br />167 <br />one 15,000 Gvw (or larger) Dump Trock <br />5 Days <br />14 <br />with an Operator (Dally Rai;) <br />400,00 <br />�00 00 <br />2000.00 <br />168 <br />One Triller Mounted Water Tan% (500 gallan <br />mInlrnum) with Pump and Hose Reel <br />5 Days <br />220.00 <br />16 <br />one Self Propelled 24" Deep by 6" wide <br />5 Hours <br />70.00 <br />850.00 <br />Trencher with an operator (Hourly Rate) <br />170 <br />one Self Propelled 24" Deep by 61' �\nde <br />5 Days <br />320,00 <br />17 <br />Trencher with an Operator (Dally Rate) <br />1 1600.00 <br />171 <br />16 <br />Bucket -rruck (equipment only) <br />(Hourly Rate) <br />20 Hours <br />50-00 <br />000.00 <br />172 <br />tiq <br />Chipper Brush (equipment only) <br />20 Hours <br />ours] <br />(Hourly Rate) <br />L <br />2200 <br />440.00 <br />Clty of Sunny lAes Reach I IT6 18-a3-02- Pa rks and Recreational Facilities Lundscape Maintenance Services <br />