Laserfiche WebLink
CTA Project No. 19-0035-001-01 01025-1 Golden Shores Street Lighting <br />October 12, 2020 SIB Bid No. 20-09-01 <br />SECTION 01025 - MEASUREMENT AND PAYMENT <br /> <br />PART 1 - GENERAL <br />1.01 SCOPE <br />A. A contract will be awarded for the total of Items 1 through 14, inclusive. It is intended that <br />all work required to complete this Project will be included in the various bid items described <br />below. Items 05 and 14 are project allowance applied to all bids. It is not mandatory to <br />submit pricing for these items. Utilization and payment of these items is at the sole <br />discretion of the City. The total base bid will include these items. <br />B. The prices stated in the Bid include full compensation for overhead and profit, all costs <br />and expenses for taxes, labor, equipment, furnishing and repairing small tools and <br />ordinary equipment, patent fees and royalties, bond, insurance, lab or for handling <br />materials during inspection, together with any and all other costs and expenses for <br />performing and completing the work as shown on the Contract Drawings and specified <br />herein. <br />C. The prices stated in the Bid include full compensation for removal and disposal of waste, <br />cleanup, and restoration of all improvements incidental to construction for which there <br />are no other bid items; including but not limited to, sprinkler systems, drainage systems, <br />guardrails, landscaping, fences, curbs and gutters, and all other work not included in <br />other bid items. <br />Payment for performing site restoration and clean-up to be included within unit price for <br />relevant pay item including, but not limited to, pavement markings, painting, finish <br />grading, driveways, sod, landscaping and any miscellaneous restoration work including <br />all labor, materials and equipment. <br />D. The CONTRACTOR's attention is called to the fact that the quotations for the various items <br />of wo rk are intended to establish a total price for completing the work in its entirety. Should <br />the CONTRACTOR determine that the Proposal or list of Bid Items has not established <br />a price for some item of work; the CONTRACTOR shall include that work in some other <br />applicable Bid Item, so that the Proposal for the project reflects the CONTRACTOR’s total <br />price for completing the work in its entirety. <br />1.02 PAYMENT ITEMS <br />The format for Payment Requests shall be as directed by the EN GINEER. This shall <br />include the level of detail and grouping of pay items. <br />A. Item No. 1 - Mobilization / General Conditions <br />The work and incidental costs specified under Mobilization will be paid lump sum and <br />include full compensation for furnishing all labor, tools, materials and equipment, including <br />but not limited to site preparation, surveying both horizontal and vertical control for <br />construction, surveyed construction as-builts, tree trimming, protection of existing utilities <br />during construction, excavation, dewatering (if necessary), adherence to Trench Safety <br />Act, demolition of existing piping and removal of said piping as shown on the drawings <br />necessary for completion of the item. Includes but not limited to, bonds and insurance, <br />those operations necessary for the movement of personnel, equipment, supplies, and <br />incidentals to the project site and for the establishment of temporary offices, buildings, <br />safety equipment and first aid supplies, sanitary and other facilities. Include any other <br />preconstruction expense, including videography of pre-construction conditions, protection <br />of existing trees with tree barricade, coordination with franchise utilities including holding