Laserfiche WebLink
06/24/2020 <br />Nunez Construction, Quote 4309475 <br />Page 2 of 6 <br />Warranty (Gateway Park Mask Area): <br />• Refer to Terms and Conditions for detailed warranty. <br />Pricing (Gateway Park Kiosk Area): <br />• $19,640 based on open shop labor. <br />Pricing Assumes: <br />All leftover product is the property of Stonhard. <br />Proposal assumes open shop labor. <br />This proposal assumes that if the General Contractor rejects the inclusion of Stonhard's warranty (tinder the <br />General Terms and Conditions) with an executed contract agreement, the General Contractor will furnish <br />Stonhard a warranty document concurrent with their issuance of the project contract. <br />The following is a list of requirements needed to ensure a successful completion of this project: <br />• Lighting - The area must have adequate lighting in order to install the specified Stonhard product. <br />Heat - A minimum substrate and material temperature of 60F must be maintained in the area to ensure <br />proper curing. <br />Electricity - The area must have a 240v/60 amp/3 phase or 480v/30 amp/3-phase power source; and <br />multiple, dedicated i I OV/20 amp outlets. <br />Trash removal - A dumpster or equivalent means of trash removal must be provided, <br />Material storage - The material must be stored in a dry, heated location in or around the area. <br />Accessibility - Area must be free of all moveable equipment and trades prior to Stonhard's arrival. <br />Price is based on one (l) phase/set-up only. 1f additional phases and/or set-ups are required, additional <br />charges will be incurred, <br />• Finished floor will follow contour of existing substrate. <br />Stonhard-trained installation team. <br />• Not responsible for damages caused by hydrostatic and/or osmotic pressure. <br />Exclusions: <br />No pitching of substrate <br />No Patching of substrate <br />C`.'iu�P..i <br />fir i�l 0y; ?i��t _ BARR RU'd. <br />