Laserfiche WebLink
Schedule of Values <br />Weekly Rate $ i; VJQOIl n: nr iiorns <br />Item <br />General Cost <br />Labor and <br />607.26 <br />material foo <br />892AS <br />a new <br />13,766.24 <br />access <br />c=ontrol <br />systom <br />controllers 6 <br />10,132.90 <br />Provide and <br />install ne'•.+r <br />exit rol.:za-es, <br />door con -tai- <br />& power, <br />supply <br />pLabor and material to pruvide necessary power (conduit and wiring) for <br />the r)ew controls and power supply <br />5:,rb tor,,rl <br />10,;3),90 <br />Provide and Install new Electrical conduit <br />from <br />existing electrical lmnFl (:CWP to 11' room, <br />new; <br />Jbox at I1 roorn to fed ea/panel and power <br />supply <br />Pun new dedicated 120 volt 20 amp Electric <br />circuit and a new Circuit Breaker on Panel <br />Includes materials and labor <br />>,r112.00 <br />Sub -total <br />2-012.00 <br />Subtotal A+ B _ <br />12,144.90 <br />General Subtotal <br />12,144.9( <br />P&P Bond (1'ai) <br />12'11.45 <br />Oved lead <br />607.26 <br />Profit (7 <br />892AS <br />TOTAL 1JS$ <br />13,766.24 <br />Notes: <br />6400 S.W. 62nd Ave. 305 774 9000 <br />`�;�:�+.rl.lrl��liarn�, l�l. 3:511:, rnrir:e.:<;unslir.rcaiUn.cu c..i:�trt�Li7�01 <br />