My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hardesty & Hanover, LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Responses
>
Hardesty & Hanover, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 10:58:06 AM
Creation date
11/23/2020 10:53:21 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SR 826 / Sunny Isles Blvd. / Palmetto Bridge over the ICWW <br />Sunny Isles Beach, Florida <br />Client <br />FDOT District 6 <br />Geidy Coello, PE <br />305.470.5421 <br />Completion Date <br />2016-current <br />Project Value <br />$ 9,000,000 Hardesty & Hanover is providing comprehensive engineering services for the <br />rehabilitation of the Sunny Isles Bridge over the ICWW. Each of the twin bridge <br />structures consist of a four-lane crossings with 16 pre-stressed AASHTO concrete and <br />steel beams spans and a double-leaf trunnion bascule span. <br />Design services included mechanical/electrical rehabilitation, steel painting, deck grating <br />replacement with wheel paths, vibration study of the control house, public involvement; <br />permitting, TCP plans, roadway, drainage, signing and pavement markings analysis and <br />plans, and construction cost estimates. <br />This design project will add bicycle lanes on Sunny Isles Boulevard, from SR A1A to NE <br />35th Avenue, and includes the addition of special safety details on the bascule grating. <br />Traffic control will include a crossover geometry which required our team to coordinate <br />with the City of Sunny Isles Beach on how to limit any impacts to a City park and <br />associated hardscape. <br />The following deficiencies were noted during inspection, addressed, and corrected: <br />deterioration of open grid steel deck (surface corrosion, distressed connectors, cracked <br />welds and broken rivets, replacement/rehabilitation of drives, bearings and locks. <br />BICYCLE GRATING – SAFETY DETAIL <br />F-20
The URL can be used to link to this page
Your browser does not support the video tag.