D-27 <br />RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D <br />For bridge decks, two options will be evaluated: cast-in-place decks and precast decks. Cast-in-place decks can be provided utilizing <br />the stay-in-place forms. Precast decks will eliminate the need for the stay-in-place forms and require less construction time for the <br />deck. Both options will be evaluated in the Alternate Study Phase (30%) of the final design. <br />For Bridge Foundation, as described in the Geotechnical/Foundation Section of this proposal, drilled shafts or auger cast piles are <br />recommended. Both the pier and elevator structures are located in the sidewalk areas. There is sufficient space at both ends of the <br />bridge to set up a work zone to place and operate the drilling equipment for foundation construction. Pedestrian traffic will be properly <br />and safely maintained outside the work zones. After the foundation is complete, the drilling equipment will be removed, ready for <br />the pier and elevator tower construction - also within the work zones. As demonstrated in the Construction Sequence Section of this <br />proposal, the bridge and elevator towers will be constructed in sequence without any significant impact to the traffic or pedestrians. <br />BEAM DELIVERY <br />Concrete U-beams in full length (about 165 ft.) after manufacturing and curing in the casting yards, will be shipped through water on <br />a barge. The beams will be picked up at a location north of NW 183rd Street as shown below. The beams will be transported to the <br />proposed bridge location on a truck through 183rd Street and Collins Avenue. <br />Figure 11: Beam Delivery Route