Laserfiche WebLink
19. RELEVANT PROJECTS <br />a. <br />(1)TITLE AND LOCATION (City and State)I-95 and Spanish River Boulevard Interchange – FDOT District 4; Palm BeachCounty, FL. (concrete bridge) <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2014-2017 <br />CONSTRUCTION <br />2014-2018 <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm <br />Senior Engineer responsible for plans preparation for a three (3) level Interchange at Spanish River Blvd. & I-95 in Boca Raton, Fl. This project <br />included the construction of a new interchange, modification of the existing Yamato Road and I-95 interchange, addition of auxiliary lanes from <br />Glades Road to Congress Avenue on I-95 and cross street improvements on Spanish River and Yamato Road. This third level interchange <br />included coordination with Federal Aviation Administration (FAA), Boca Airport, City of Boca Raton, and Florida Atlantic University (FAU). This <br />improvement provides connectivity between FAU, Tri-Rail, and I-95 and relieves daily congestion as well as event traffic generated during <br />events held at the FAU stadium. <br />b. <br />(1)TITLE AND LOCATION (City and State)I-75/I-595/Sawgrass Interchange, Broward County, FL (Precast Segmental) - FDOT 4 YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />1985-1987 <br />CONSTRUCTION <br />1987-1990 <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm <br />I was part of the design of substructure for 9 segmental bridges. Performed quality control of the superstructure of the segmental bridges for the <br />phase two part of the project. This four-level, directional interchange of three of the most important transportation facilities in Broward County, <br />Florida, was designed for staged construction. 14 of a total of 17 bridges have been designed as segmental concrete box girders. This is the <br />largest (550 acres) interchange in Florida and has outstanding geometric features. <br />c. <br />(1)TITLE AND LOCATION (City and State)SR-9(I-95) Design-Build Bridge over Box Culvert South of 45th Street, Palm Beach County, FL - FDOT District 4 <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2006-2008 <br />CONSTRUCTION <br />2007-2009 <br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm <br />This design-Build project with Hubbard Construction Company involved the construction of new 60 foot single span bridge over an existing <br />drainage, S&M and MOT design and plans preparation. I performed structural design and coordination with FDOT and the contractor as during <br />construction support services during entire construction. <br />d. <br />(1)TITLE AND LOCATION (City and State) <br />MDX 836-11, Design-Build SR-836, I-395 and I-95 Southbound to SR 836 Westbound, YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2018-Ongoing <br /> CONSTRUCTION <br />Current <br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Consists of 19 bridges, new and widening, that includes proposed Viaduct over 100 feet high above the Miami River and integration of <br />SR -836 to existing Interchange I -95 and I 395. For this ongoing Project, Mr. Dagly is responsible for review of Design submittals, At 90 %, 100 <br />% and Final for the MDX portion of SR -836. Mr .Dagly will also review post Design service including shop drawings, construction <br />related field issue & RFI etc. <br />e. <br />(1) TITLE AND LOCATION (City and State)City of Miami Gardens: Design Build of Hard Rock Stadium Renovation Pedestrian Bridges and Ramp MSE walls <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2018-2019 <br /> CONSTRUCTION <br />2019 <br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm <br />As Design Team, Mr. Dagly Prepared lay out of Pedestrian Bridges and Ramps MSE wall over NW 199th Street as well as over Florida turnpike <br />Access Road. These pedestrian bridges will eliminate traffic congestions and provide easy access to Hard Rock Stadium and will be ready <br />before 2020 Super bowl which will be held in this stadium. <br />2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12.NAME:Dinesh Dagly, PE 13.ROLE IN THIS CONTRACT: <br />Quality Control <br />14.YEARS EXPERIENCE <br />a.TOTAL:50 b. WITH CURRENT FIRM: <br />5 <br />15.FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Suite 410, Miami, FL 33126 <br />16.EDUCATION (Degree and Specialization):1968 Master of Science Civil Engineering Wayne State University 1966 Bachelor of Science in Civil Engineering, Sardar Patel University, India <br />17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 29386 <br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.):