|
19. RELEVANT PROJECTS
<br />a.
<br />(1)TITLE AND LOCATION (City and State)I-95 and Spanish River Boulevard Interchange – FDOT District 4; Palm BeachCounty, FL. (concrete bridge)
<br />YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014-2017
<br />CONSTRUCTION
<br />2014-2018
<br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm
<br />Senior Engineer responsible for plans preparation for a three (3) level Interchange at Spanish River Blvd. & I-95 in Boca Raton, Fl. This project
<br />included the construction of a new interchange, modification of the existing Yamato Road and I-95 interchange, addition of auxiliary lanes from
<br />Glades Road to Congress Avenue on I-95 and cross street improvements on Spanish River and Yamato Road. This third level interchange
<br />included coordination with Federal Aviation Administration (FAA), Boca Airport, City of Boca Raton, and Florida Atlantic University (FAU). This
<br />improvement provides connectivity between FAU, Tri-Rail, and I-95 and relieves daily congestion as well as event traffic generated during
<br />events held at the FAU stadium.
<br />b.
<br />(1)TITLE AND LOCATION (City and State)I-75/I-595/Sawgrass Interchange, Broward County, FL (Precast Segmental) - FDOT 4 YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />1985-1987
<br />CONSTRUCTION
<br />1987-1990
<br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm
<br />I was part of the design of substructure for 9 segmental bridges. Performed quality control of the superstructure of the segmental bridges for the
<br />phase two part of the project. This four-level, directional interchange of three of the most important transportation facilities in Broward County,
<br />Florida, was designed for staged construction. 14 of a total of 17 bridges have been designed as segmental concrete box girders. This is the
<br />largest (550 acres) interchange in Florida and has outstanding geometric features.
<br />c.
<br />(1)TITLE AND LOCATION (City and State)SR-9(I-95) Design-Build Bridge over Box Culvert South of 45th Street, Palm Beach County, FL - FDOT District 4
<br />YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2006-2008
<br />CONSTRUCTION
<br />2007-2009
<br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm
<br />This design-Build project with Hubbard Construction Company involved the construction of new 60 foot single span bridge over an existing
<br />drainage, S&M and MOT design and plans preparation. I performed structural design and coordination with FDOT and the contractor as during
<br />construction support services during entire construction.
<br />d.
<br />(1)TITLE AND LOCATION (City and State)
<br />MDX 836-11, Design-Build SR-836, I-395 and I-95 Southbound to SR 836 Westbound, YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018-Ongoing
<br /> CONSTRUCTION
<br />Current
<br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Consists of 19 bridges, new and widening, that includes proposed Viaduct over 100 feet high above the Miami River and integration of
<br />SR -836 to existing Interchange I -95 and I 395. For this ongoing Project, Mr. Dagly is responsible for review of Design submittals, At 90 %, 100
<br />% and Final for the MDX portion of SR -836. Mr .Dagly will also review post Design service including shop drawings, construction
<br />related field issue & RFI etc.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)City of Miami Gardens: Design Build of Hard Rock Stadium Renovation Pedestrian Bridges and Ramp MSE walls
<br />YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018-2019
<br /> CONSTRUCTION
<br />2019
<br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm
<br />As Design Team, Mr. Dagly Prepared lay out of Pedestrian Bridges and Ramps MSE wall over NW 199th Street as well as over Florida turnpike
<br />Access Road. These pedestrian bridges will eliminate traffic congestions and provide easy access to Hard Rock Stadium and will be ready
<br />before 2020 Super bowl which will be held in this stadium.
<br />2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12.NAME:Dinesh Dagly, PE 13.ROLE IN THIS CONTRACT:
<br />Quality Control
<br />14.YEARS EXPERIENCE
<br />a.TOTAL:50 b. WITH CURRENT FIRM:
<br />5
<br />15.FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Suite 410, Miami, FL 33126
<br />16.EDUCATION (Degree and Specialization):1968 Master of Science Civil Engineering Wayne State University 1966 Bachelor of Science in Civil Engineering, Sardar Patel University, India
<br />17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 29386
<br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.):
|