My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EAC Consulting, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Responses
>
EAC Consulting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 11:01:33 AM
Creation date
11/23/2020 10:59:19 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EAC’s Workload <br />EAC as the Prime Consultant, currently has an average workload. <br />($& KDV SURSRVHG VWDII UHVRXUFHV GHGLFDWHG VSHFLÀFDOO\ WR WKLV <br />contract. We have similarly teamed with sub-consultants who have <br />the availability for the required services. The adjacent table shows <br />the availability of our Key Personnel assigned on this project, and <br />demonstrates that our current workload will not impact this project. <br />Our dedicated local Project Manager will be responsive, and will <br />have additional assistance from the Deputy Project Manager. With <br />an overall staff of 89 professionals (which includes 28 PEs, 12 EIs/ <br />Engineers and 18 CEI personnel), the resources of EAC are more <br />WKDQVXIÀFLHQWWRPHHWDQGH[FHHGWKHSHUIRUPDQFHUHTXLUHPHQWV <br />on this project. <br />EAC’s Capability to Perform Additional Work <br />With its overall staff, EAC has more than enough staff resources to <br />excel on this project, as well as to perform additional work resulting <br />from this contract - upon the City’s request. <br />Warranty <br />'XULQJWKHWHUPRIWKH$JUHHPHQWDOOUHTXLUHGOLFHQVHVFHUWLÀFDWLRQV <br />and permits required under federal, state, and local laws necessary <br />to perform the services for this contract will be kept in good standing. <br />Name Role Project <br />Availability <br />K.T. Lin, PE, Ph.D.Project Manager 100% <br />Stephanie Romero, PE Deputy Project Mgr 100% <br />Abid Hadrous, PE Structures Design 100% <br />Chun Li, PE Structures Design 100% <br />Ning Wang, PE Structures Design 100% <br />+DPLG$QDMDÀ(,3K'Structures Design 100% <br />David Gilpin-Hudson, AICP Planner 100% <br />Enrique “Rick” Crooks Planning 80% <br />Dinesh Dagly, PE QA/QC 100% <br />Jenner Alfaro, PE Constructability 100% <br />Adriana Savino, AIA Architecture 100% <br />Daniel Vasini, ASLA Landscape Architecture 100% <br />Barry Miller, ASLA Landscape Architecture 100% <br />Adriaan Geuze, AIA, ASLA Architecture & <br />Landscape Architecture 80% <br />Huntley Higgins, PE Civil Engineering Design 90% <br />Satiar Shirazi, PE Roadway Design & MOT 100% <br />Cesar Quiroz, PE Roadway Design & MOT 80% <br />Herman Tirado, PE Drainage 100% <br />Gisele Colbert, MS Environmental 100% <br />Luz Urbaez Weinberg Public Involvement 100% <br />Name Title Address Telephone No. <br />Harold Desdunes, PE Senior Vice President/ <br />Project Principal 5959 Blue Lagoon Drive, <br />Suite 410, Miami, FL 33126 <br />305-265-5400 ext. 5441 <br />KT Lin, PE, PhD Senior Vice President/ <br />Project Manager 305-265-5400 ext. 5412 <br />Performance Guarantee <br />With our Project Team’s combined expertise, we are prepared and equipped to serve the City. In summary the EAC Project Team offers <br />the following: <br />Long History with State, County and Municipal Clients in South Florida – Our team collectively brings a wealth of experience <br />with clients in the State of Florida. <br />Expertise and Experience ²2XUSURSRVHGVWDIÀQJSODQLQFOXGHVSURIHVVLRQDOVZKRKDYHZRUNHGRQVLPLODUSURMHFWVDQGWDVNV <br />Some of these professionals have worked together collaboratively to accomplish project objectives. <br />Strong Track Record of Performance – Our clients will attest to our performance. Up to 80% of EAC’s workload is new work <br />opportunities from existing clients. <br />Proven Management Leadership – Our designated Principal in Charge (Harold Desdunes, PE) and Project Manager (K.T. Lin, <br />PE) are industry leaders that have proven their ability to manage and lead. <br />Commitment to Safety – We will successfully complete the services in a safe manner that protects the public, complies with <br />all governing requirements and provides the City with a bridge that requires minimal maintenance to safely provide its intended <br />purpose. <br />:HDUHKRSHIXOWKDWRXUVXPPDU\RITXDOLÀFDWLRQVJLYHV\RXWKHFRQÀGHQFHWRVHOHFW($&&RQVXOWLQJ,QF($&ORRNVIRUZDUGWR <br />SURYLGLQJWKHUHTXLUHGVHUYLFHVWRWKH&LW\DQGZHDUHFRQÀGHQWWKDWZHZLOOH[FHHGWKH&LW\·VH[SHFWDWLRQVRQWKLVSURMHFW <br />Sincerely, <br />EAC Consulting, Inc. <br /> <br />Harold Desdunes, PE – Principal in Charge <br />Persons Authorized to Make Representations <br />Our primary representatives to warrant and represent that at all times during the term of the Agreement that all required licenses, <br />FHUWLÀFDWLRQVDQGSHUPLWVUHTXLUHGXQGHUIHGHUDOVWDWHDQGORFDOODZVQHFHVVDU\WRSHUIRUPWKHVHUYLFHVIRUWKLVFRQWUDFWDUHLQJRRG <br />standing are: <br />C-3
The URL can be used to link to this page
Your browser does not support the video tag.