Laserfiche WebLink
(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (if <br />Howard Frankland Northbound Bridge Replacement <br />Pinellas & Hillsborough Counties, Florida <br />applicable) <br />2020 <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current company <br />e. <br />Scope: This design -build project will build a new southbound/westbound (from Tampa to St. Petersburg) <br />interstate bridge over Old Tampa Bay between Hillsborough and Pinellas counties in West Central Florida. <br />Bentley is providing architectural and engineering services associated with the addition of express lane <br />tolling, bridge aesthetics and renovation of the existing Regional Traffic Management Center. Role: Project <br />Manager/Architect of Record. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Regional Stormwater Park Restroom Pavilion Design <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (if <br />Oviedo, Florida <br />applicable) <br />f <br />2020 <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />x Check if project performed with current company <br />Scope: Design and preparation of construction documents for <br />the design of a restroom pavilion featuring <br />two bathrooms, one for men and one for women. Role: Project <br />Manager/Architect of Record. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (if <br />SunTrax Test Facility Phases 1 and 2 <br />Polk County, Florida <br />applicable) <br />Ph. 2 2020 <br />Ph.2 on-going <br />g. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current company <br />Scope: Design of a new test facility for Florida's Turnpike Enterprise. Phase 1 scope included design of a 10,500 <br />square foot operations building and an 8,500 square foot storage building to house various Tolling Equipment <br />Contractor and FDOT activities. Phase 2 design involves several additional administrative, lab and operations <br />spaces. Role: Project Manager/Architect of Record. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (if <br />Westmonte Park Redevelopment <br />Altamonte Springs, Florida <br />applicable) <br />2020 <br />2020 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current company <br />h' <br />Scope: Design and preparation of construction documents for the redevelopment of Westmonte Park. <br />Redevelopment of the community park includes a new multipurpose pool, new administration building with a <br />multipurpose/activity room, new pavilion structures, and new outdoor bathrooms building. Site improvements <br />include an expanded parking area, new driveways, park sidewalks, tennis courts, pickle -ball courts, basketball <br />courts, and bocce courts. An underground stormwater management system will be constructed under the <br />parking and under the multipurpose field. Role: Architect of Record <br />