My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pedelta
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Responses
>
Pedelta
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 12:15:43 PM
Creation date
11/23/2020 12:07:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21.TITLE AND LOCATION (Cityand State) <br />Cranes Roost Park Redevelopment <br />Altamonte Springs, Florida <br />23. PROJECT OWNER'S INFORMATION <br />20. EXAMPLE PROJECT KEY NUMBER <br />3. <br />22. YEAR COMPLETED <br />PROFESSIONAL I CONSTRUCTION (IF <br />SERVICES APPLICABLE) <br />2016 1 2016 <br />A. PROJECT OWNER B. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER <br />City of Altamonte Springs I Steve Falk 1 (407) 571-8733 <br />Project Narrative. Design and preparation of construction documents for the reconstruction of Cranes Roost Park. Bentley's <br />scope included the reconstruction of Cranes Roost Blvd. with new roadway pavers, reconstruction and widening of park <br />sidewalks, and installation of pavers throughout the Eddie Rose Amphitheater. The reconstruction design also included <br />the complete replacement of one of the two boardwalks spanning the Cranes Roost lake and the partial replacement of <br />the other. A floating stage was rehabilitated as part of the project to include a new green room and bathroom facilities <br />within the floating stage. New water fountains and benches were installed throughout the park. <br />103- <br />
The URL can be used to link to this page
Your browser does not support the video tag.