Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Arturo R. Toirac Senior Right of Way Mapper a. TOTAL b. WITH CURRENT FIRM <br />54 10 <br />15. FIRM NAME AND LOCATION (City and State) <br />C. H. Perez & Associates Consulting Engineers, Inc. <br />Doral, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />BS in Civil Engineering, Universidad de la Habana, Cuba, Professional Surveyor & Mapper, Florida <br />1962 PSM No. 3102, 1977 <br />Bilingual-English/Spanish <br />urgamzamons, i raining, Awards, etc.) <br />19. RELEVANT PROJECTS <br />153- <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (if appl. <br />Brant Drive Bridge replacement from Oregon LN to Avocet RD (Palm Beach <br />Co.) <br />2019 <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ® Check if project performed with current firm <br />a. <br />Primary and Secondary Horizontal and Vertical Control, DTM, Subsurface Utility Engineering, Drainage Survey, Bridge <br />Survey, Canal Soundings, Sectional / Grant Survey, and Subdivision location. <br />(1) TITLE AND LOCATION (City and State) <br />2 YEAR COMPLETED <br />1-95 southbound ramp to eastbound Okeechobee BLVD (Palm Beach Co.) <br />PROFESSIONAL SERVICES <br />CONSTRUCTION(ifappl. <br />2019 <br />I <br />b. <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ® Check if project performed with current firm <br />Setting Primary and Secondary Horizontal and Vertical Control, DTM, Subsurface Utility Engineering, Drainage Survey, <br />Bridge Survey, Canal Soundings, Sectional / Grant Survey, and Subdivision location. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (ifappl.) <br />Scour countermeasure for Oakland Park Blvd. over C-13 Canal (Bridge NO. <br />860139 Broward Co. <br />2019 <br />(3) BRIEF DESCRIPTION (Briefscope, size, cos4 etc.) AND SPECIFIC ROLE ®Check if project performed with current firm <br />c. <br />Setting and establishing State Plane Coordinates and Elevations for Secondary Horizontal and Vertical Control, Drainage <br />Survey, and Right of Way, Alignment Canal Soundings. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (ifappL) <br />Snowden Pedestrian Bridge along Commodore Trail N. of SW 174 ST over C100 <br />Canal adjacent to Bridge 874293 <br />2019 <br />d• <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost etc.) AND SPECIFIC ROLE ® Check if project performed with current firm <br />Setting Primary and Secondary Horizontal and Vertical Control, DTM, Drainage Survey, Bridge Survey, Canal Soundings, <br />Sectional / Grant Survey, Right of Way, Alignment and Subdivision location. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />SERVICES <br />CONSTRUCTION(ifappl.) <br />Scour countermeasure for SR 800 / Spanish River Blvd. over IntracoastalPROFESSIONAL <br />Waterway (Bridge Nos. 930154 & 930226 Palm Beach Co. <br />2019 <br />e. <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ® Check if project performed with current firm <br />Setting Primary and Secondary Horizontal and Vertical Control, DTM, Drainage Survey, Bridge Survey, Canal Soundings, <br />Sectional / Grant Survey, Right of Way, Alignment and Subdivision location. <br />153- <br />