|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Mariano Ponzoa Senior Survey Techniciank
<br />TOTAL b. WITH CURRENT FIRM
<br />2 12
<br />15. FIRM NAME AND LOCATION (City and State)
<br />C. H'Perez & Associates Consulting Engineers, Inc.
<br />Doral, Florida
<br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) \
<br />BS Civil Engineering, Universidad de la Habana, Cuba, 1988 1 N/A
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Bilingual-English/Spanish
<br />19. RELEVANT PROJECTS
<br />-156-
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (ifappl.
<br />Brant Drive Bridge replacement from Oregon LN to Avocet RD (Palm Beach
<br />Co.)
<br />2019
<br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ® Check if project performed with current firm
<br />a.
<br />Primary and Secondary Horizontal and Vertical Control, DTM, Subsurface Utility Engineering, Drainage Survey, Bridge
<br />Survey, Canal Soundings, Sectional / Grant Survey, and Subdivision location.
<br />(1) TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (ifappl.
<br />1-95 southbound ramp to eastbound Okeechobee BLVD (Palm Beach Co.)
<br />2019
<br />I
<br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ® Check if project performed with current firm
<br />b.
<br />Setting Primary and Secondary Horizontal and Vertical Control, DTM, Subsurface Utility Engineering, Drainage Survey,
<br />Bridge Survey, Canal Soundings, Sectional / Grant Survey, and Subdivision location.
<br />(1) TITLE AND LOCATION (City and State)
<br />2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (ifappl.)
<br />Scour countermeasure for Oakland Park Blvd. over C-13 Canal (Bridge No.
<br />860139) (Broward Co.
<br />2019
<br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ®Check if project performed with current firm
<br />c•
<br />Setting and establishing State Plane Coordinates and Elevations for Secondary Horizontal and Vertical Control, Drainage
<br />Survey, and Right of Way, Alignment Canal Soundings.
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (ifappl.)
<br />Snowden Pedestrian Bridge along Commodore Trail N. of SW 174 ST over C100
<br />Canal adjacent to Bridge 874293
<br />2019
<br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ® Check if project performed with current firm
<br />d•
<br />Setting Primary and Secondary Horizontal and Vertical Control, DTM, Drainage Survey, Bridge Survey, Canal Soundings,
<br />Sectional / Grant Survey, Right of Way, Alignment and Subdivision location.
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION(ifappl.)
<br />Scour countermeasure for SR 800 / Spanish River Blvd. over Intracoastal
<br />Waterway (Bridge Nos. 930154 & 930226 Palm Beach Co.
<br />2019
<br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ® Check if project performed with current firm
<br />e•
<br />Setting Primary and Secondary Horizontal and Vertical Control, DTM, Drainage Survey, Bridge Survey, Canal Soundings,
<br />Sectional / Grant Survey, Right of Way, Alignment and Subdivision location.
<br />-156-
<br />
|