My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pedelta
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Responses
>
Pedelta
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 12:15:43 PM
Creation date
11/23/2020 12:07:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20. EXAMPLE PROJECT KEY NUMBER <br />21. TITLE AND LOCATION (City and State) I 22. YEAR COMPLETED <br />CocoPlum Bridge Replacement PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) <br />Miami, FL 2020 N/A <br />23. PROJECT •WNER'S INFORMATION <br />a. PROJECT OWNER 1b. POINT OF CONTACT NAME 1c. POINT OF CONTACT TELEPHONE NUMBER <br />Miami -Dade County Department of Transportation Marie -Elsie Dowell, P.E. (305) 514-3125 <br />and Public Works <br />Client: WSP USA <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />The project is planned to be located at LeJeune Road/SW 42nd Avenue over the C-3 Canal/Coral Gables Canal in Miami. <br />A new bridge will be constructed and will be supported by shallow foundations at each end bent, and the existing bridge <br />will be demolished, including existing foundations. The new foundations will be 48 feet long by 8 feet wide located at each <br />end bents. <br />Terracon performed subsurface exploration (advancement of test borings and percolation tests) and geotechnical <br />engineering services in order to provide relative information and geotechnical engineering recommendations in relation to <br />subsurface soil conditions, groundwater conditions, site preparation and earthwork, excavation considerations, foundation <br />design and construction, lateral earth pressure, slope stability, and hydraulic conductivity value. <br />Firm's Fee: $28,325 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />so_ STANDARD FORM 330 (REV. 8/2016) <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />a. <br />1rerracon <br />Fort Lauderdale, FL <br />Subconsultant <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />b. <br />1rerracon <br />Miami Lakes, FL <br />Subconsultant <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />C. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />d. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />e. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />f. <br />so_ STANDARD FORM 330 (REV. 8/2016) <br />
The URL can be used to link to this page
Your browser does not support the video tag.