Laserfiche WebLink
Calvin, Giordano & Associates, Inc. <br />E X C E P T 1 0 N A L S 0 L U T 1 0 N S'" <br />November 13, 2020 (Revised) <br />Mr. Paul Abbott <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, FL 33160 <br />Building Code Services <br />RE: ADJUSTMENT TO CEI FUNDING <br />Civil Engineering / Roadway <br />& Highway Design <br />Financial Project No.: 430949-3-58-01 (Construction) <br />Coastal Engineering <br />CEI Project No.: 181023 Collins Ave A1A Decorative Lighting from Bayview Dr. to SR856. <br />Code Enforcement <br />Contract: C3120006, PO# 19-00339 <br />Construction Engineering & <br />County: Miami -Dade <br />Inspection (CEI) <br />Construction Services <br />Data Technologies & <br />Project Name: Sunny Isles Beach Lighting Project <br />Development <br />Dear Mr. Abbott, <br />Electrical Engineering <br />Engineering <br />Please accept this letter as a request from Calvin, Giordano & Associates, Inc. for additional funding <br />Environmental Services <br />to our contract, to complete our work for the lighting project along Colins Avenue, in the City of Sunny <br />Facilities Management <br />Isles Beach. <br />Geographic Information <br />Systems (GIs) <br />We are requesting an extension of funds because the original scope and resulting estimated work <br />Governmental Services <br />has become much more complicated due to utilities. The original effort to install pre -cast foundations <br />Indoor Air Quality <br />has quadrupled in time, with spread footers, requiring density compaction and inspections of base <br />Landscape Architecture <br />materials, steel installation and inspections, concrete installation and testing, etc. The use of FDOT's <br />Planning <br />Materials System, MAC, is now a requirement for acceptance, when it wasn't needed before. CGA's <br />Project Management <br />sampling and testing is also an extra that wasn't required in the original scope. <br />Redevelopment <br />& Urban Design <br />Surveying & Mapping <br />We have estimated the cost request to be $126,977.03 This figure comes from the following: <br />Traffic Engineering <br />Transportation Planning <br />Original Contract: $176,000. <br />Water/ Utilities Engineering <br />Additional Costs up to 9/24/2020, CGA $36,575.00 and 8/30/2020, PSI $12,656.53 = $49,231.53 <br />Website Development <br />Additional Future costs: CGA 36,575/3.43 = $10,663/mo. X 6.5 mo. (Mid April 2021) _ $69,309.50 <br />Additional Future costs: PSI 12,656/ 9 Months= $1,406/mo. X 6 months = $8,436 <br />We appreciate your consideration. <br />Thank you. Sincerely, <br />1800 Eller Drive <br />Suite 600 <br />Digitally signed by Erik <br />Fort Lauderdale, FL <br />Erik Padron Pa <br />Datte: e:2 2020.17.13 <br />33316 <br />10:03:17-05'00' <br />954.921.7781 phone <br />Erik Padron, PE <br />954.921.8807 fax <br />Senior Project Engineer <br />WWW.cgasolutions.com <br />cc: Moe Mabrouk, Director of CEI <br />Attachment "A" <br />FORTLAUDERDALE MIAMI-DADE WEST PALM BEACH CLEARWATER/TAMPA ESTERO PORT ST. LUCIE <br />