My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2020-3151
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2020
>
Reso 2020-3151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2021 10:35:15 AM
Creation date
1/12/2021 10:21:33 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2020-3151
Date (mm/dd/yyyy)
12/17/2020
Description
Award Invitation to Bid No. 20-09-01 and approving Agreement w/ AUM Construction, Inc for Golden Shores Street Lighting Improvement Project.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Never interfere with resident’s access to home <br />o Have steel plates available to cover a trenchif necessary –to allow access to <br />neighborhood as needed <br />o Sandra Block, from police, will manage all details <br />o Prefer to use City police but (3) other cities assist: Golden Beach, Bay Harbor, & <br />Indian Creek. <br />o Available on website for charges, or reach out to City Clerk, Mauricio Betancur <br />1 Addendum for this process <br />o Revised bid form <br />o Line item: value engineering not to be included in base bid/but interject value <br />engineering into it <br />o Represent to City what value engineeringidea you have - materials, means& <br />method etc. <br />Sealed separate envelope, included in bid for value engineering <br />Allowance <br />o Contingency set amount, not based on % of construction, need City’s approval <br />first <br />o Service points – overhead power to undergrounding – there may be an alternate to <br />service point construction <br />Line item: spread footing <br />o Will be presented in Addendum, understand unit price for spread footing <br />o Bid to include sales tax <br />o Utilize direct Purchase Order processto release tax savings <br />o Administer cost impact <br />o Addendum will include bidder’s lists, minutes with directions <br />th <br />Schedule (if need to pick-up 6day) <br />o If need to work to meet schedule on Saturdays, need to request from City, have to <br />have permission first <br />o Cannot be holidays or other events that may be going on in the City <br />TIM: Ask if we defined the schedule? <br />PAUL: No we did not. <br />Once awarded and delivery of fixtures & lights is confirmed a schedule will be required <br />from successful bidder, contract time will be “of the essence” <br />o Conduit, boxes, decorative fixtures, are many weeks away <br />o Start layout, identify & confirm right-of-way <br />o The City will not set control points <br />o Adamant about maintaining field red line – as built conditions - all of installations <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.