design to optimize fabrication, constructability and cost efficiencies, as requested by FDOT, in an
<br />amount not to exceed $99,900.00, bringing the total contract amount not to exceed $3,155,050.00;
<br />and
<br />WHEREAS, on December 17th, 2020 via Resolution No. 2020-3147, the City Commission
<br />approved a Sixth Amendment to the Agreement with for the development of a Maintenance of
<br />Traffic plan, as required by FDOT, in an amount not to exceed $15,782.00, bringing the total
<br />contract amount not to exceed $3,170,832.00; and
<br />WHEREAS, city staff, along with P+W, met with FDOT and it was determined that
<br />additional construction engineering services were required, including but not limited to: concrete
<br />detailing, additional coordination related to traffic study, expanded construction sequence, facade
<br />connection details in structural set, maintenance coordination and implementation, and
<br />incorporation of added geotechnical information ("Additional Services"); and
<br />WHEREAS, P+W has submitted quotes to perform the Additional Services, as required
<br />by FDOT; and
<br />WHEREAS, the City Commission now wishes to approve a Seventh Amendment to the
<br />Agreement with Perkins+Will Architects, Inc. for the aforementioned Additional Services, in an
<br />amount not to exceed One Hundred Ninety -Three Thousand Forty -Four Dollars ($193,044.00),
<br />bringing the total contract amount not to exceed Three Million Three Hundred Sixty -Three
<br />Thousand Eight Hundred Seventy -Six Dollars ($3,363,876.00), attached hereto as Exhibit "A".
<br />NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
<br />CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS:
<br />Section 1. Approval of Seventh Amendment. The City Commission hereby approves a
<br />Seventh Amendment to the Agreement with Perkins+Will Architects, Inc. for additional
<br />construction engineering services were required, including but not limited to: concrete detailing,
<br />additional coordination related to traffic study, expanded construction sequence, facade connection
<br />details in structural set, maintenance coordination and implementation, and incorporation of added
<br />geotechnical information, in an amount not to exceed One Hundred Ninety -Three Thousand Forty -
<br />Four Dollars ($193,044.00), bringing the total contract amount not to exceed Three Million Three
<br />Hundred Sixty -Three Thousand Eight Hundred Seventy -Six Dollars ($3,363,876.00), attached
<br />hereto as Exhibit "A".
<br />Section 2. Authorization of Mayor. The Mayor is hereby authorized to execute said
<br />Amendment.
<br />Section 3. Authorization of City Manager. The City Manager is hereby authorized to do all
<br />things necessary to effectuate this Resolution.
<br />Section 4. Effective Date. This resolution shall become effective upon adoption.
<br />PASSED AND ADOPTED this 18th day of February 2021.
<br />George H. Scholl, Mayor
<br />82021 7th Amend to Perkins and Will for Gov Ctr Annex Page 2 of 3