My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2021-3199
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2021
>
Reso 2021-3199
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2022 1:39:07 PM
Creation date
6/21/2021 12:33:40 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2021-3199
Date (mm/dd/yyyy)
05/20/2021
Description
Agmt w/Craig A. Smith for Civil Engineering Svcs for the Central Island Area Pump Stations and Drainage Improv.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRAIG A. SMITH & ASSOCIATES PROPOSED SCOPE OF SERVICES <br />P4009 -- PAGE 4-- <br />E74 & <br />E75 ONE CALL COORDINATION & EM / GPR LOCATING <br />Coordinate with SSOCOF to ascertain approximate facility locations prior to vacuum <br />excavation in accordance with FS 556. Perform project "White Lining" in accordance with <br />FS 556. Maintain database of SSOCOF Tickets and responses. Perform EM / GPR <br />locating to confirm information derived from review of as-builts and coordination with <br />member operators, identify buried power, telecom, CATV, water, sewer and drainage <br />facilities, identify potentially unknown/unclaimed facilities and supplement surface <br />markings for collection by CAS Survey. Prepare sketch of identified facilities. <br />$13,800.00 <br />E78 VACUUM EXCAVATION ("SOFT DIGS") <br />Perform up to fifty (50) "soft digs" to identify the type, size, and material as well as depth <br />to the top of potentially conflicting and / or newly identified or previously unknown facilities. <br />Prepare Vacuum Excavation reports including location sketch with facility type, size, depth <br />and composition. (Survey not included, see survey proposal for soft dig survey price). <br />Additional soft digs above this amount will be charged at the rate of $495.00 each, <br />exclusive of survey. Provide coordination with CAS Survey and Engineering Departments <br />to review subsurface utility information and review survey maps to ensure accurate <br />depiction of located facilities. <br />$24,750.00 <br />E53A DRAINAGE ANALYSIS AMD SYSTEM DESIGN <br />CAS will develop drainage improvements to the area by completing 1:20 scale plans (full <br />size 36" x 24") & 1:40 scale plans (half size 17"x 11 ") for bidding and construction containing <br />plan and profile views of the proposed work using the most recently obtained version of <br />Autodesk Civil3D CADD software. Prior to the above, CAS will compile survey obtained <br />data for the development of stormwater model and for preliminary analysis purposes. CAS <br />will perform computer hydrologic and hydraulic modeling of the area for multiple design <br />storm events of the current and proposed conditions and compare results. CAS will perform <br />pipe sizing analysis of existing system and incorporate recommended improvements with <br />water quality treatment measures in the design in accordance with the South Florida Water <br />Management District and Miami -Dade County permit requirements. CAS will coordinate <br />with local utilities as reasonably necessary in order to resolve known utility conflicts during <br />the design. CAS will provide the necessary engineering information to the City to assist the <br />City with obtaining the necessary easements from the affected property owner(s). CAS will <br />produce progress prints at the request of the City or as required by grant requirements. <br />$160,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.