My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2021-3199
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2021
>
Reso 2021-3199
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2022 1:39:07 PM
Creation date
6/21/2021 12:33:40 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2021-3199
Date (mm/dd/yyyy)
05/20/2021
Description
Agmt w/Craig A. Smith for Civil Engineering Svcs for the Central Island Area Pump Stations and Drainage Improv.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.2.1 Execution of this Agreement by the Consultant constitutes a representation that the <br />Consultant has become familiar with the Project site and the local conditions under which <br />the Project is to be implemented. <br />2.2.2 Consultant shall review, examine, and verify the documents and information furnished by <br />the City concerning the Project site with respect to locations, elevations, and all other <br />existing conditions, etc., before preparing design documents. Consultant shall compare any <br />documents furnished by the City to the Project site to verify dimensions, clearances and <br />the like before preparing design documents. The Consultant shall be solely responsible for <br />any inaccuracies or conflicts that might have been detected or avoided by such verification. <br />2.3 THIRTY PERCENT DESIGN DOCUMENTS <br />2.3.1 The Consultant shall review and examine the information, including any desired schedule <br />and budgetary requirements, furnished by the City to understand the requirements of the <br />Project and shall review its understanding of such requirements with the City. <br />2.3.2 The Consultant shall furnish to the City a preliminary written evaluation of such <br />information in light of any Project budget requirements. <br />2.3.3 The Consultant shall review and discuss with the City any alternative approaches to design <br />and construction of the Project. <br />2.3.4 The Consultant shall prepare and submit to the City for its review 30% design documents <br />consisting of drawings and other documents illustrating the scale and relationship of <br />proposed Project components. The Consultant shall be responsible for furnishing a legal <br />description and any necessary survey(s) of the site, including, as may be reasonably <br />required, grades and lines of streets, alleys, pavements and adjoining structures, rights -of - <br />way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and <br />contours of the site; locations, dimensions and necessary data pertaining to existing <br />buildings and other improvements; and information concerning available service and utility <br />lines above and below grade, including inverts and depths. <br />2.3.5 The Consultant shall submit to the City an estimate of probable construction costs for the <br />Project. <br />2.4 SIXTY PERCENT DESIGN DOCUMENTS <br />2.4.1 Based on the 30% design documents and any adjustments to that design, the proposed <br />schedule, or Project budget authorized by the City, the Consultant shall prepare and submit <br />to the City for its review, 60% design documents consisting of drawings and other <br />documents to fix and describe the size and character of the Project as to civil, architectural, <br />structural, mechanical and electrical systems; landscape architectural and irrigation design; <br />materials and such other elements as may be appropriate. <br />2.4.2 The Consultant shall review its estimate of probable construction costs, shall make any <br />appropriate revisions thereto and furnish same to the City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.