Laserfiche WebLink
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947 -0606 phone (305) 949 -3113 Fax <br />replace it with non - defective work. Contractor shall bear all direct and indirect <br />costs of such removal or corrections including cost of testing laboratories and <br />personnel. <br />10.2 Should Contractor fail or refuse to remove or correct any defective work or to make <br />any necessary repairs in accordance with the requirements of this Agreement <br />within the time indicated in writing by the City Manager or its designee, the City <br />shall have the authority to cause the defective work to be removed or corrected, or <br />make such repairs as may be necessary at Contractor's expense. Any expense <br />incurred by the City in making such removals, corrections or repairs, shall be paid <br />for out of any monies due or which may become due to Contractor. In the event of <br />failure of Contractor to make all necessary repairs promptly and fully, which is not <br />cured in the cure period, the City may declare Contractor in default. <br />103 If, within one (1) year after the date of completion of Services or such longer <br />period of time as may be prescribed by the terms of any applicable special <br />warranty required by the Contract Documents, or by any specific provision(s) of <br />this Agreement, any of the work is found to be defective or not in accordance with <br />this Agreement, Contractor, after receipt of written notice from the City or its designee, <br />shall promptly correct such defective or nonconforming work within the time specified <br />by the City without cost to the City. Nothing contained herein shall be construed to <br />establish a period of limitation with respect to any other obligation which <br />Contractor might have under this Agreement including but not limited to any claim <br />regarding latent defects. <br />10.4 Failure to reject any defective work or material shall not in any way prevent <br />later rejection when such defect is discovered, or obligate the City to final <br />acceptance. <br />10.5 Where the City or its designee becomes aware of faults, defects or non - conformity <br />in any of the work provided under this Agreement or with the work being <br />performed by the Contractor, the City or its designee shall issue a Notice to Cure <br />to the Contractor for correction. In no event shall the failure of the City or its <br />designee to bring to the attention of the Contractor of such faults act as a waiver or <br />release the Contractor from responsibility or liability for such fault, defect or non- <br />conforming work. <br />11. TERMINATION AND REMEDIES FOR BREACH. <br />A. If, through any cause within reasonable control, the Contractor shall fail to fulfill in <br />a timely manner or otherwise violate any of the covenants, agreements or <br />stipulations material to this Agreement, the City shall have the right to terminate the <br />Services then remaining to be performed. Prior to the exercise of its option to <br />terminate for cause, the City shall notify the Contractor of its violation of the <br />particular terms of the Agreement and grant Contractor ten (10) days to cure such <br />default. If the default remains uncured after ten (10) days the City may terminate <br />C1314 -051 - PLAYMORE WEST, INC <br />