My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 10:14:46 AM
Creation date
9/1/2021 10:11:02 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Utility Undergrounding Conversion for Golden Shores
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />01310 - 6/6 <br />Recovery plans that require a change in the Construction Contract Schedule must be <br />submitted as a Revision in accordance with this specification. <br />C. The CONTRACTOR’S refusal, failure or neglect to take appropriate recovery action <br />or to submit a written recovery statement shall constitute reasonable evidence that <br />the CONTRACTOR is not prosecuting the WORK, or separable part, with the <br />diligence that will ensure its completion within the Contract Time. Such lack of action <br />shall constitute sufficient basis for the CITY to recommend the withholding of some <br />or all of any payment due and/or shall be considered grounds for termination of the <br />contract by the CITY in accordance with Article 15 of the General Condition. <br /> <br />END OF SECTION <br />
The URL can be used to link to this page
Your browser does not support the video tag.