My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 10:14:46 AM
Creation date
9/1/2021 10:11:02 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Utility Undergrounding Conversion for Golden Shores
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />01410 - 3/3 <br />1. Release, revoke, alter or enlarge on requirements of the Contract Documents. <br />2. Approve or accept any portion of the Work. <br />3. Perform any duties of the Contractor. <br />1.05 TRANSMITTAL OF TEST REPORTS: <br />A. Written reports of test and engineering data furnished by Contractor shall be <br />submitted as specified in SECTION 01300. <br />B. Advanced copies of test results must be submitted for completed work with each <br />application for payment. <br />1.06 MEASUREMENT AND PAYMENT: <br />Laboratory testing, surveying and other quality control and compliance measures and <br />procedures shall not be paid separately. Rather, the costs for such activities shall be part <br />of the contractor’s unit costs of the items to which they pertain. <br /> <br />END OF SECTION <br />
The URL can be used to link to this page
Your browser does not support the video tag.