My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 10:14:46 AM
Creation date
9/1/2021 10:11:02 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Utility Undergrounding Conversion for Golden Shores
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />01630 - 2/2 <br />4. The Contractor waives all claims for additional costs related to substitution that <br />subsequently becomes apparent. <br />5. Cost data is complete and includes all related costs under the contract. <br />1.03 ENGINEER'S REVIEW: The Engineer, in evaluating the request for substitution, will <br />consider all variations of the proposed substitute from that specified to determine the <br />acceptability of the proposal. The Engineer may require the Contractor to furnish <br />additional data about the proposed substitute necessary to make such a determination. <br />The Engineer will be the sole judge of acceptability, and no substitute will be ordered or <br />installed without the Engineer's prior written acceptance. The City may require the <br />Contractor to furnish, at the Contractor's expense, a special performance guarantee or <br />other surety with respect to any substitute. Substitutions will not be considered if: <br />A. Substitutions are indicated or implied on shop drawings or product data submittals <br />without a request submitted in accordance with this section. <br />B. Acceptance will require substantial revision to the Contract Documents. <br /> <br />END OF SECTION <br />
The URL can be used to link to this page
Your browser does not support the video tag.