My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 10:14:46 AM
Creation date
9/1/2021 10:11:02 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Utility Undergrounding Conversion for Golden Shores
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />02050 - 3/3 <br />3.03 CONNECTIONS TO EXISTING CONSTRUCTION: <br />A. The CONTRACTOR shall cut and remove portions of existing construction as <br />required to allow proper installation of new construction. <br />B. The CONTRACTOR shall shore, brace and maintain existing structure(s) in a safe <br />condition until permanent supports are completed. <br />C. The CONTRACTOR shall repair all damage as a result of installation of shoring and <br />bracing. <br />3.04 CLEANUP AND REPAIR: <br />A. Upon completion of demolition work, the CONTRACTOR shall remove tools, <br />equipment and demolished materials from site; see SECTION 1.0 and 3.02 A and B <br />of this specification. <br />B. The CONTRACTOR shall repair demolition performed in excess of that required and <br />return structures and surfaces to conditions existing prior to commencement of <br />demolition work. The CONTRACTOR shall repair adjacent construction or surfaces <br />soiled or damaged by demolition work. <br />C. The CONTRACTOR shall remove or modify as indicated all existing construction <br />within the construction limits to the extent necessary to permit construction of the <br />work. The CONTRACTOR shall properly dispose of the material at an approved site <br />according to the State, Federal, and local regulations. <br /> <br />END OF SECTION <br />
The URL can be used to link to this page
Your browser does not support the video tag.