My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2021-3257
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2021
>
Reso 2021-3257
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 12:50:50 PM
Creation date
10/28/2021 11:29:27 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2021-3257
Date (mm/dd/yyyy)
10/21/2021
Description
Awd Bid No. 21-08-01, and Approve Agmt w/Stout Group, Inc. for Golden Shores Utility Undrgrnd
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3�. • py�F OW <br />C,rr OF sVN <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 City Hall <br />(305) 949-3113 Fax <br />MEMORANDUM <br />TO: Honorable Mayor and City Commissioners <br />FROM: Christopher J. Russo, City Manager <br />DATE: October 21, 2021 <br />RE: Award of ITB 21-08-01 and Authorize the City Manager to Negotiate witl <br />The Stout Group for the Golden Shores Undergrounding Project <br />RECOMMENDATION: <br />Staff recommends approval of this Resolution. <br />REASONS: <br />The undergrounding project was professionally designed, publicly advertised and bids were received <br />on September 28,2021. Five (5) bids were received ranging in dollar value from $4,406,749.09 to <br />$7,998,381.51. The target budget established by the City was approximately $7,000,000. <br />The low bid was determined to be non "responsible and responsive" due to technical deficiencies and <br />bid content, as confirmed by City legal counsel. The second bid in the amount of $5,858,477.87 was <br />reviewed for technical conformance to the bidding documents, references were verified, previous <br />work experience confirmed, and a post bid interview conducted. <br />Therefore, it is recommended that The Stout Group, Inc. be selected to execute the project at the <br />aforementioned contract amount and that contract negotiations commence immediately with a <br />proposed construction commencement of November 1, 2021. The project duration is anticipated to <br />require eighteen (18) months for completion. <br />FUNDING SOURCE: <br />Funds have been appropriated in account no. 300-5-5410-465000-20003. <br />ATTACHMENTS: <br />Resolution <br />Item Number: 10.K <br />
The URL can be used to link to this page
Your browser does not support the video tag.