Laserfiche WebLink
Mr. Paul Abbott <br />CTA Proposal No. 2020-H07.064 (Revised) <br />March 5, 2020 <br />Page 6 <br />Acceptance <br />This proposal and fee schedules are based on acceptance within 30 days of the date of preparation. If <br />not accepted by you within that time -period, we reserve the right to re-evaluate the terms and <br />conditions contained herein. <br />If the proposed work and fees contained herein are agreeable with you, please sign the enclosed copy of <br />this letter and return same to our office. Should you have any questions regarding the above, please do <br />not hesitate to call. <br />Sincerely, <br />CRAVEN THOMPSON & ASSOCIATES, INC. <br />f <br />TIM J. HALL, P.E. PAT IC.: � . NEY, P. E. <br />Senior Supervising Engineer Vice P e;I nt, Engineering <br />TJ H/tg <br />ACCEPTANCE OF PROPOSAL: The above fees, terms, conditions, and specifications are satisfactory and <br />are hereby accepted. You are authorized to do the work as specified. ' Payment will be made as <br />outlined. <br />THIS PROPOSAL ACCEPTED BY: <br />Name & Title <br />Firm Name <br />Date <br />Telephone Number <br />Facsimile Number <br />CRKNEN•1HOMPSON & ASSOCIATES INC <br />