My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Zoning Resolution 22-Z-189
SIBFL
>
City Clerk
>
Resolutions
>
Zoning
>
2022
>
Zoning Resolution 22-Z-189
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2022 9:29:57 AM
Creation date
3/29/2022 12:39:09 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Zoning Resolution
Resolution Number
22-Z-189
Date (mm/dd/yyyy)
02/17/2022
Description
Approving site plan modification App PZ2021-22, by La Playa Beach Assoc., LLC formerly known as "Varadero" located 18801 Collins Ave.
Supplemental fields
Comment
Per Claudia 3/29/22, docs have to be executed and recorded once project comes from Build permit, cc: Finance, C/M, and Building Dept.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
multiple level are active work zones, multiple catch platform shall be installed. The <br />Applicant shall be responsible for decreasing and preventing materials, debris, concrete <br />spillage, dust, paint, construction material etc. from falling to private and public property. <br />3) That the approved site plan shall remain valid for a period of 72 -months from the date of <br />the site plan modification approval, provided that a building permit is obtained for the <br />south tower within 48 months. If no building permit is issued within the 48 -month time <br />period for the south tower, the site plan shall be considered null and void and of no force <br />and effect. If the building permit for the south tower is issued within the 48 -month time <br />period, then the Applicant shall obtain a building permit for the north tower within 24 <br />months of the issuance of the south tower building permit. <br />4) That the Applicant complies with all City Ordinances, County, State and Federal Laws and <br />Regulations applicable to development and permit approvals. <br />5) All sand excavated from the property including sand from the western side of the Coastal <br />Construction Control Line ("CCCL") shall be cleaned and shall remain on the beach for re - <br />nourishment purposes in a location to be determined by Miami -Dade County Regulatory <br />and Economic Resources ("RER") (formerly Miami -Dade County Department of <br />Environmental Resources Management "DERM"). <br />Section 5. Authorization of City Manager. The City Manager is hereby authorized to do all <br />things necessary to effectuate this Resolution. <br />Section 6. Severability. If any section, subsection, sentence, clause, phrase, or portion of this <br />Resolution is, for any reason, held invalid or unconstitutional by any Court of competent <br />jurisdiction, such portion shall be deemed a separate, distinct and independent provisions and <br />such holding shall not affect the validity of the remaining potions of this Resolution. <br />Section 7. Repealer. All Resolutions or parts of Resolutions in conflict herewith shall be and <br />are hereby repealed. <br />Section 8. Effective Date. This Resolution shall become effective upon adoption. <br />PASSED AND ADOPTED this 17th day of February 2022. <br />Dana Robin Goldman, Mayor <br />AlEST: APPROVED AS TO FORM <br />AND LEGAL SUFFICIENCY: <br />Marici Bet +cur, CMC, City Clerk d6ward A. Dion, City Attorney <br />
The URL can be used to link to this page
Your browser does not support the video tag.