Laserfiche WebLink
• Attend one (1) preconstruction meeting with CITY, CGA <br />Construction Administration Department, and Contractor. <br />• Attend up to twelve (12) biweekly construction progress <br />meetings. <br />• Review up to ten (10) submittals as required of the Contractor, <br />such as shop drawings. This includes one (1) resubmittal review <br />of each, if needed. <br />• Review and respond to Contractor Requests for Information <br />(RFIs). This includes up to ten (10) RFIs. <br />• Review signed and sealed as-builts provided by the Contractor. <br />This includes up to two (2) reviews. <br />• Prepare and submit permit closeout packages to South Florida <br />Water Management District and RER. <br />5. Structural Engineering (Subconsultant) <br />Structural Engineering shall be subcontracted to Alan Gerwig & <br />Associates, Inc. (AGA) for the required revisions to the <br />Structural plans, permitting, bidding, and post design services as <br />they pertain to the Structural components of the project. <br />Permitting is limited to two (2) rounds of comments for items <br />not directly related to an AGA error or omission. <br />Revisions are understood to include specifications and drawings <br />(to meet current code), design of waterproofing for the electrical <br />room slab and walls, lower roof of the electrical room, removal <br />of the door between the electrical room and pump room, <br />removal of the grating and details in the electrical room, adding a <br />new doorway and exterior steps to the pump room, revising the <br />doorway and steps to the electrical room, removing the sluice <br />gate opening in the pump room, removing the sluice gate <br />operator and associated work areas, and revising the sluice gate <br />opener support beam and pump room roof layout. <br />355 <br />