Laserfiche WebLink
r KEITH <br />Engineering Inspired Design. <br />WORK AUTHORIZATION PURSUANT TO THE <br />CONTINUING PROFESSIONAL ENGINEERING SERVICES <br />AGREEMENT BETWEEN THE CITY OF OF SUNNY ISLES BEACH AND <br />KEITH AND ASSOCIATES, INC. (KEITH) <br />MaFGh 31, 2022 <br />April 6, 2022 <br />WORK AUTHORIZATION NO. # 02 <br />TASK ORDER NO. (CITY No. TBD) PROJECT N0.11723.02 (KEITH) <br />PROJECT NAME: New Park at Ritz Carlton Sales Center Site <br />Project Location: 15800 Collins Ave., Sunny Isles Beach, FL 33160 <br />1=1911111:101111 <br />The City of Sunny Isles Beach (CITY/OWNER/CLIENT) has requested that KEITH (CONSULTANT) <br />provide Civil Engineering and Landscape Architecture professional services for the development of a <br />new park at the location of the former Ritz Carlton Sales Center site. <br />The property is identified within Folios #31-2214-008-0071 and #31-2214-004-0180, owned by the <br />City of Sunny Isles and is approximately 0.7 acres. The existing park property is located on the <br />northwest corner of 158th Street and Collins Avenue (S.R. A1A). <br />The Construction Documents and shall consist of: <br />1. Removal of existing trailers. <br />2. Install at least one (1) multiuse court that allow tennis / basketball / volleyball. <br />3. Install as many pickle ball courts as possible. <br />4. All courts should be lighted. <br />5. Construct a small building consisting of: <br />a. An open concept welcome kiosk station / office consisting of two workstations to assist <br />visitors. Approx. 1,000 SF. <br />b. Storage / Closet space to store court equipment. <br />c. Restrooms with exterior access for use by staff and visitors to the park. The CITY <br />indicated that they would prefer it be located towards the north end of the facility (if <br />possible) to allow visitors to the Intracoastal Waterway Park to the north to use it. <br />The City advised that the building will be designed by City selected Architect (Rodriguez <br />Architects, Inc.) under separate contract but will require KEITH to closely coordinate with them. <br />6. Landscape and Hardscape Improvements consistent with other existing parks throughout the <br />City. Shading of the courts from Collins Avenue (S.R. A1A) and saving existing trees (seagrapes) <br />to the south is important. The City indicated that they will allow variations in hardscape elements <br />from other parks but in addition to aesthetics, durability and low maintenance is key. <br />www.KEITHteam.corn <br />pompano beach (HQ) • fort Lauderdale • miami + west palm beach • orlando a tallahassee 520 <br />