April 6, 2022 / Page 10 of 12 <br />11723.02 — New Park at Ritz Carlton Sales Center Site <br />City of Sunny Isles Beach <br />CONSTRUCTION / PROJECT MANAGEMENT SERVICES <br />Construction / Project Management Services are not included in this scope of work. If required, the <br />CONSULTANT will be pleased to provide additional services under a separate agreement. <br />PROJECT SCHEDULE <br />Subsequent to the issuance of a Purchase Order from the CITY, CONSULTANT shall commence work <br />on the project. We anticipate commencing work within 5 business days from notice to proceed, <br />completing the prescribed work within six (6) months. <br />Table 1 Schedule Estimate of Services <br />TASK <br />DURATION <br />6 weeks <br />Task 101 - Boundary and Topographic Survey <br />Task 102 Existing Easement Research (By Subconsultant - Paramount <br />Title Services) — Optional Services <br />4 weeks <br />Task 201 - Geotechnical Testing and Reporting (By Geotechnical Sub. — <br />NV5) <br />Concurrent <br />with Task 101 <br />Task 301 - Site Plan Preparation and Processing <br />2 months <br />Task 401 - Preliminary Engineering / Design Development Plans <br />1 month <br />Task 402 - Engineering Construction Documents (CD) <br />3 months <br />Task 403 - Engineering Permitting <br />2 to 3 months <br />Task 501 — Electrical Construction Documents (CD) (By Electrical Sub. - <br />SGM Engineering) <br />Concurrent <br />with Task 402 <br />Task 701 - Preliminary Landscape / Design Development Plans <br />Concurrent <br />with Task 401 <br />Task 702 - Tree Inventory and Appraisal by Certified Arborist <br />Concurrent <br />with Task 401 <br />Task 703 - Landscape Construction Documents (CD) <br />Concurrent <br />with Task 402 <br />Schedule Disclaimer: <br />Considering the ongoing outbreak of the Coronavirus 2019 (COVID-19), KEITH remains fully <br />committed to pursuing the completion of our work in a safe, diligent, and reasonable manner under <br />the current circumstances based on the schedule provided. It is possible that we will encounter certain <br />delays because of this pandemic. Potential impacts may include, but are not limited to, labor shortages <br />due to mandated quarantine regulations, material shortages and significant delays in lead times <br />because of factory closings across the globe. We will continue to monitor the situation and advise of <br />any delays resulting from the impacts of the current worldwide health scenario. <br />Engineering Inspired Design. 529 <br />