Laserfiche WebLink
April 6, 2022 / Page 12 of 12 <br />11723.02 — New Park at Ritz Carlton Sales Center Site <br />City of Sunny Isles Beach <br />COMPENSATION <br />Consultant shall invoice the City for services rendered under this Agreement on a lump sum basis, <br />unless otherwise stated, and in accordance with the terms and conditions of the Continuing Services <br />Agreement for Professional Engineering Services between the City of Sunny Isles Beach and KEITH. <br />Table 2 Budget Estimate of Engineering Services <br />Task 101 - Boundary and Topographic Survey <br />$9,600(Lump Sum <br />Task 102 - Existing Easement Research (By Subconsultant - <br />Paramount Title Services) — Optional Services <br />$1,350 (Lump Sum) <br />Task 201 - Geotechnical Testing and Reporting (By Geotechnical <br />Sub. - NV5) <br />$2,400 (Lump Sum) <br />Task 301 - Site Plan Preparation and Processing <br />$8,500(Lump Sum <br />Task 401 - Preliminary Engineering / Design Development Plans <br />$7,000(Lump Sum <br />Task 402 - Engineering Construction Documents (CD) <br />$10,500(Lump Sum <br />Task 403 - Engineering Permitting <br />$7,500(Lump Sum <br />Task 501 - Electrical Construction Documents (CD) (By Electrical <br />Sub. - SGM) <br />$4,100 (Lump Sum) <br />Task 701 - Landscape Design Development Plans <br />$ 7,500(Lump Sum <br />Task 702 - Tree Inventory and Appraisal by <br />Certified Arborist <br />$ 3,000 (Lump Sum) <br />Task 703 - Landscape Construction Documents (CD) <br />$13,500(Lump Sum <br />CONSULTANT'S TOTAL COMPENSATION <br />$74,950 (Lump Sum) <br />DIRECT EXPENSES / REIMBURSABLES <br />$3,500 Time and Materials) <br />TOTAL FEE <br />$78,450 <br />"CITY": <br />CITY OF SUNNY ISLES BEACH <br />By: <br />0 <br />CONSULTANT: <br />KEITH <br />By: <br />ALEX LAZOWICK <br />President <br />Engineering Inspired Design. 531 <br />