My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3334
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3334
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2022 11:50:11 AM
Creation date
6/3/2022 9:27:23 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3334
Date (mm/dd/yyyy)
05/19/2022
Description
Agreement w/ Keith & Associates, INc. d/b/a Keith, to provide Civil Engineering & Landscape Architectural Svcs for Bella Vista Bay Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� KEITH <br />Engineering Inspired Design. <br />WORK AUTHORIZATION PURSUANT TO THE <br />CONTINUING PROFESSIONAL ENGINEERING SERVICES <br />AGREEMENT BETWEEN THE CITY OF OF SUNNY ISLES BEACH AND <br />KEITH AND ASSOCIATES, INC. (KEITH) <br />ppil Q 2477 <br />April 14, 2022 <br />April 19, 2022 <br />WORK AUTHORIZATION NO. # 04 <br />TASK ORDER NO. (CITY No. TBD) PROJECT NO.11723.04 (KEITH) <br />PROJECT NAME: Bella Vista Park <br />Project Location: 500 Sunny Isles Beach Blvd., Sunny Isles Beach, FL 33160 <br />PROJECT <br />The City of Sunny Isles Beach (CITY/OWNER/CLIENT) has requested that KEITH (CONSULTANT) <br />provide Civil Engineering and Landscape Architecture professional services for the development of <br />a new park at the Bella Vista Park site. <br />The property is identified within Folios # 31-2214-007-0210. The property is owned by the City of <br />Sunny Isles. The existing park property is located on the southeast corner of the Sunny Isles Beach <br />Blvd (S.R. 826) bridge and the Intracoastal Waterway. <br />The overall property is approximately 0.9 acres. The CITY has requested KEITH to develop <br />Construction Documents consisting of: <br />1. Install new seawall to replace existing Rip -Rap Embankment to fill-in area and maximize <br />uplands. <br />2. Construct a small building consisting of: <br />a. Marine patrol office, open concept welcome kiosk station for kayak/paddle board <br />rentals. <br />b. City would like to use existing concrete slab as building foundation. <br />The City advised that the building will be designed by City selected Architect under separate <br />contract but will require KEITH to closely coordinate with them. <br />3. Provide baywalk connection alternatives. Site may have significant elevation changes with the <br />adjacent new Chabad building currently under construction (approx. 8' NGVD). City advised <br />that alternative baywalk connection solution may be to connect the Chabad' baywalk and wrap <br />it along the alley and not connect it to the park. <br />4. Wastewater service to the new building will need to use a new grinder pump station . <br />5. Site lighting should be limited to life safety only. Park will not be open at night. <br />6. Landscape and Hardscape Improvements consistent with other existing parks throughout the <br />City. The City indicated that they will allow variations in hardscape elements from other parks <br />but in addition to aesthetics, durability and low maintenance is key. <br />www.KEITHteam.com <br />pompano beach (HQ) • fort Lauderdale • miami s west palm beach • orlando • tallahassee 428 <br />
The URL can be used to link to this page
Your browser does not support the video tag.