My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3334
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3334
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2022 11:50:11 AM
Creation date
6/3/2022 9:27:23 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3334
Date (mm/dd/yyyy)
05/19/2022
Description
Agreement w/ Keith & Associates, INc. d/b/a Keith, to provide Civil Engineering & Landscape Architectural Svcs for Bella Vista Bay Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 14 <br />11723.04 — Bella Vista Park <br />City of Sunny Isles Beach <br />SURVEY SERVICES <br />Task 101 Boundary and Topographic Survey <br />KEITH shall prepare a Boundary and Topographic Survey of the site. Survey shall show the boundary <br />lines together with surface improvements such as buildings, roadways, pavement, sidewalks, traffic <br />striping, walls, fences, surface utilities, etc. <br />Topography includes surrounding rip -rap, boulders and neighboring southern seawall. As -built of <br />dock, piles, electrical hook-ups,etc. (below deck features excluded). Includes soundings of submerged <br />are to the approximate boundary as depicted in yellow. Storm and Sanitary structures shall be noted <br />with the pipe invert elevation, diameter, material, and direction. Off-site survey along the service road <br />up to the existing sanitary sewer manhole to the east of the site. Elevations shall be shown at an <br />interval of approximately 50 feet, including intermediate changes in grade. <br />Note: Vertical Datum for this survey shall be NGVD 1929 unless otherwise directed by Client <br />and the Horizontal Datum shall be NAD 83/2011. <br />Task 102 Mean High Water Survey (Optional Service) <br />KEITH shall prepare a Mean High Water Survey. Survey to determine the Mean High Water Line <br />following the guidelines set by the Bureau of Surveying and Mapping, Florida Department of <br />Environmental Protection. <br />Note: Vertical Datum for this survey shall be NGVD 1929 unless otherwise directed by Client <br />and the Horizontal Datum shall be NAD 83/2011. <br />Engineering Inspired Design. 430 <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.