Laserfiche WebLink
Page 10 of 14 <br />11723.04 — Bella Vista Park <br />City of Sunny Isles Beach <br />Visit the site where the new park is going to be built to investigate and survey the following <br />conditions of the area: <br />a. Record all existing electrical utilities in the area that are required to be removed or <br />relocated to make space for the new park. <br />2. Provide design for new electrical underground branch circuits (conduit and wire) for the life <br />safety lighting added to the park. All design associated with upland portions and excludes <br />new dock. <br />3. Provide lighting fixture schedules for all life -safety lighting. <br />4. Provide selection of code complaint (wind load) parking lot poles with associated bases and <br />underground boxes. <br />5. Provide new panelboards and circuit breakers at existing buildings for source of power for all <br />lighting fixtures and irrigation equipment. <br />6. Design documents will include electrical book of construction specifications. <br />LEED administration or design services are not included in this proposal. These services can be <br />provided by SGM at additional cost. <br />STRUCTURAL AND ENVIRONMENTAL ENGINEERING DESIGN SERVICES <br />(Trident — Structural and Environmental Sub.) <br />Refer to Exhibit 'C' — Structural and Environmental Engineering (Sub -Consultant) Scope and Fees. <br />Task 601 Marine Structural Construction Documents (CD) and Permitting — New Seawall <br />(Trident — Structural / Environmental Sub.) <br />Provide detailed drawings and specifications for County, State, Federal and Municipality Approval, <br />including plans, cross sections, layout, details and calculations. <br />Prepare and submit the permit applications for the construction of the new seawall for the new Bella <br />Vista Park and process them through the following regulatory agencies: <br />• US Army Corps of Engineers (ACOE) — ERP <br />• Florida Department of Environmental Protection (FDEP) — ERP <br />• Miami -Dade County DERM Class I — Coastal Resources Section. <br />• City of Sunny Isles Beach Engineering Department. <br />LANDSCAPE ARCHITECTURE SERVICES <br />Task 701 Preliminary Landscape / Design Development Plans (DD) <br />KEITH will prepare for the approval of the Client the Preliminary Landscape Plans. The purpose of this <br />task is to work collaboratively with the design team to finalize the optimum arrangement of all program <br />and site design elements. These drawings will be in sufficient detail for submittal to the City's Planning <br />and Development Services Department for review and approval of the preliminary design. The <br />following elements will be addressed in the Preliminary / Design Development phase: <br />1. Site program <br />a. Landscape treatment and design approach for each development zone, including <br />refinement of design concepts for all outdoor spaces. <br />b. Hardscape and vehicular treatments. <br />c. Pedestrian circulation and access issues identified in conceptual programming. <br />Engineering Inspired Design. 437 <br />