My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3334
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3334
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2022 11:50:11 AM
Creation date
6/3/2022 9:27:23 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3334
Date (mm/dd/yyyy)
05/19/2022
Description
Agreement w/ Keith & Associates, INc. d/b/a Keith, to provide Civil Engineering & Landscape Architectural Svcs for Bella Vista Bay Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 14 of 14 <br />11723.04 — Bella Vista Park <br />City of Sunny Isles Beach <br />COMPENSATION <br />Consultant shall invoice the City for services rendered under this Agreement on a lump sum basis, <br />unless otherwise stated, and in accordance with the terms and conditions of the Continuing <br />Services Agreement for Professional Engineering Services between the City of Sunny Isles Beach <br />and KEITH. <br />Table 2 Budget Estimate of Engineering Services <br />Task 101 - Boundaryand Topographic•Surve Y <br />$10,000(Lump Sum <br />Task 102 - Mean High Water Survey (Optional Service) <br />$2,500(Lump Sum <br />Task 103 - Existing Easement Research (By Subconsultant - <br />Paramount Title Services) — Optional Services <br />$1,350 (Lump Sum) <br />Task 201 - SUE Horizontal Designation Services <br />$2,000(Lump Sum <br />Task 202 - SUE Location Services <br />$3,250(Lump Sum <br />Task 203 - SUE Utility Mapping <br />$1,400(Lump Sum <br />Task 204 - Geotechnical Testing and Reporting (NV5 — Geotech <br />Sub.) <br />$5,250 (Lump Sum) <br />Task 301 - Site Plan Preparation and Processing <br />$6,000(Lump Sum <br />Task 401 - Preliminary Engineering / Design Development Plans <br />$5,000(Lump Sum <br />Task 402 - Engineering Construction Documents <br />$8,000(Lump Sum <br />Task 403 - Engineering Permitting <br />$9,500(Lump Sum <br />Task 501 - Electrical Construction Documents (CD) (SGM <br />Engineering - Electrical Sub.) <br />$2,680 (Lump Sum) <br />Task 601 - Structural Construction Documents (CD) and <br />Permitting — New Seawall (Trident — Structural / <br />Environmental Sub. <br />$6,500 (Lump Sum) <br />Task 701 - Preliminary Landscape / Design Development Plans <br />$6,500(Lump Sum <br />Task 702 - Landscape Construction Documents <br />$9,500(Lump Sum <br />CONSULTANT'S TOTAL COMPENSATION <br />$79,430 (Lump Sum) <br />DIRECT EXPENSES / REIMBURSABLES <br />$3,500 (Time and Materials) <br />TOTAL FEE <br />$82,930(Lump Sum)l <br />"CITY": <br />CITY OF SUNNY ISLES BEACH <br />By: <br />CONSULTANT: <br />KEITH <br />By: <br />ALEX LAZOWICK <br />President <br />Engineering Inspired Design. 441 <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.