Laserfiche WebLink
3.6 The City's review of any documents prepared by the Consultant or its subconsultants <br />shall be solely for the purpose of determining whether such documents are generally <br />consistent with the City's construction program and intent. No review of such <br />documents shall relieve the Consultant of its responsibility for the accuracy, adequacy, <br />fitness, suitability and coordination of its work product. <br />SECTION 4 CONSTRUCTION COSTS <br />4.1 If the cost of construction exceeds the cost agreed upon by the City by more than 5% <br />of the lowest bona fide bid or negotiated proposal, the City may (1) give written <br />approval of an increase in such fixed limit, (2) authorize rebidding or renegotiating of <br />the Project, (3) terminate the Project and this Agreement in accordance herewith, or (4) <br />cooperate in revising the Project scope or quality, or both, as required to reduce the <br />construction cost. In the case of (4), the Consultant, without additional charge to the <br />City, shall consult with the City and shall revise and modify the drawings and <br />specifications as necessary to achieve compliance with the cost agreed upon by the <br />City. Absent negligence on the part of the Consultant in making its estimates of probable <br />construction cost, providing such modifications and revisions shall be the limit of the <br />Consultant's responsibility arising from the establishment of such construction costs, <br />and having done so, the Consultant shall be entitled to compensation for all other <br />services performed, in accordance with this Agreement. <br />SECTION 5 BASIS OF COMPENSATION <br />5.1 The City shall compensate the Consultant for an amount not to exceed $79,430.00 based <br />on services rendered pursuant to Sections 2.3 through 2.5 and EXHIBIT 111," Scope of <br />Services. Billings for each phase shall not exceed the amount allocated to each phase. <br />5.2 Payment to the Consultant of the sum set forth in Section 5.1 shall be allocated for work <br />completed for each of the following tasks: <br />Task 101 - Boundary and Topographic Survey .......................................... <br />$10,000.00 <br />Task 102 - Mean High Water Survey (Optional Service) ............................. <br />$2,500.00 <br />Task 103 - Existing Easement Research (By Subconsultant - Paramount <br />Title Services) — <br />OptionalServices.......................................................................................... <br />$1,350.00 <br />Task 201 - SUE Horizontal Designation Services ........................................ <br />$2,000.00 <br />Task 202 - SUE Location Services............................................................... <br />$35250.00 <br />Task 203 - SUE Utility Mapping.................................................................. <br />$1,400.00 <br />Task 204 - Geotechnical Testing and Reporting (NV5 — Geotech Sub.)...... <br />$5,250.00 <br />Task 301 - Site Plan Preparation and Processing .......................................... <br />$6,000.00 <br />Task 401 - Preliminary Engineering / Design Development Plans .............. <br />$5,000.00 <br />Task 402 - Engineering Construction Documents ........................................ <br />$8,000.00 <br />422 <br />