Laserfiche WebLink
O <br />Z_ <br />Q <br />ry <br />O <br />U <br />THE CORRADINO GROUP, INC. <br />ENGINEERS • PLANNERS • PROGRAM MANAGERS • ENVIRONMENTAL SCIENTISTS <br />July 25, 2022 <br />Mr. Jorge DeLaNuez <br />City of Sunny Isles Beach <br />RE: SIB Shuttle, Comprehensive Operations Analysis <br />This is a proposal to assist with a Comprehensive Operational Analysis of the SIB Shuttle. It is our <br />understanding that the City of Sunny Isles Beach desires to enhance the performance of its three <br />routes, (Orange Line #1, Orange Line #2, and Blue Line) so that they can operate at the highest <br />level, as well as explore other alternatives to boost ridership and minimalize automobile traffic. <br />This study will focus on increasing ridership, consider transitioning to, some extent, to demand <br />response service, examine route timing, days and hours of service, consider the benefits and <br />costs of an internal service vs an outsourced service, exploring other alternatives to automobile <br />mobility and finally, integrating with other cities, locations and services. In doing this it will be <br />important understand different traffic generators and hubs to help improve and revitalize the <br />current service routes, examine different service amenities that would make riders more <br />comfortable, to evaluate different emerging technologies like on demand service or first mile/last <br />mile service, as well as understand rider's needs. <br />Corradino will determine appropriate route alternatives and examine the potential locations of <br />new stops. An analysis of potential new route options will be undertaken to determine if <br />additional mobility and connectivity can be provided to other generators, such as schools, parks, <br />and shopping areas like in connection with Normal Edlecup Elementary (SIB K-8), as well as the <br />FIU Biscayne Bay Campus. The project will be supported by a detailed public engagement <br />campaign. <br />The following is a detailed scope of services, timeline and price. <br />Scope of Work <br />Task 1: Identify Existing Conditions, and Route Performance <br />Task 2: Alternative Routes <br />Task 3: Public Engagement <br />Task 4: Final Report <br />4055 ��vV Q7-rH A VENUE SUITE'oo - NIJAN11. rr, 33178 <br />TEL 305594.0735 - 800.887.5551 <br />PA,< 305 594 1)755 <br />1;V11V%V CORRAD1?�O ( -'O Q <br />