Laserfiche WebLink
Veitchla mattgomeryana <br />-- <br />162.00 <br />I44 <br />Mont9amery Palm <br />5,g <br />8 605.64 <br />596.00 <br />5.13 <br />IB'•20'ht. tri a Wnt <br />576.80 <br />163.00 <br />I95 <br />WadYatia bi7urtata-Foatail Path <br />5.40 <br />165.00 <br />5.0 <br />721.00 4 757.05 <br />sob ot4l Stolon 9" Unes No. 69 -163; <br />I. MATERIALS <br />-- <br />160.00 <br />596.00 <br />5.13 <br />JI <br />Coconut Palm OTC Injection <br />Aop6rNM <br />5.40 <br />165.00 <br />395.00 <br />32 <br />Date Palm OTC Injection <br />App6taH4n <br />166.00 <br />TopWI (70/30 Mix) Delivered and <br />200.00 <br />48'67 <br />Iretaled <br />46.35 <br />J3 <br />Cu. Yd. <br />L67,00 <br />Premium Gold Mulch Delivered and <br />1,500.00 <br />_ <br />Installed <br />74 <br />Cu. Yd. <br />32.96 <br />34.61 <br />166.00 <br />Premium Gold Mulch Delivered and <br />100.00 <br />3.52 <br />installed <br />3 35 <br />15 <br />Bags 2 cu. R. <br />169.00 <br />e70 Trap Sand Delhered and <br />700.00 <br />Installed <br />16 <br />Cu. Yd. <br />30.90 <br />IN <br />32.45 <br />170.00 <br />Atlas 3000 (or equal) Mix N11 eyed <br />100.00 <br />and Installed <br />17 <br />Cu. Yd. <br />$3.56 <br />$614 <br />171.00 <br />Solid St. Auqustlne'Flonwim' Sod <br />2,500.00 <br />Delivered and Installed <br />HI <br />Sq. Ft. <br />0.72 <br />0.76 <br />60 pallets <br />172.00 <br />Solid St. Augustine'Floratanl' Sod <br />0e11vered and Installed <br />19 <br />(500 SF <br />360,50 <br />S <br />37853 <br />Each <br />Solid Bennuda'ThvaY 419'Turf <br />5 pallas <br />173.00 <br />Delivered and Installed <br />]to <br />(400 SF <br />412.00 <br />; <br />432,60 <br />Each) <br />Solid Paspa(um noratum'Argentine' <br />5 pallets <br />17x.00 <br />Bahia Sod Delivered and Installed <br />Jll <br />(9005F <br />566.50 <br />S <br />594.83 <br />Each <br />175.00 <br />12 <br />Dalm Bath Ca Rork <br />4Sq. H. <br />41.20 <br />43.26 <br />Suttogl Section "J" Lines No. <br />145 -175: <br />K. I ASOR <br />176.00 100 Hours (Sam - 5pm, M -F) <br />KI One Lvids,cape Superintendent 30.90 <br />32.45 <br />177.00 100 Hours (All other times) <br />K2 One landscape Superintendent 41.20 <br />43.26 <br />178.00 too Hours ($am- Spm, Mi) <br />K3 One Landscape Laborer 25,75 <br />27.04 <br />179.00 100 Hours (All other times) <br />K9 One Landst a Laborer 25.75 <br />27.Q4 <br />1II0.00 75 Hour (Bam - Spm, M F) <br />NS One hK anon SpedMist 30.90 <br />32.45 <br />181.00 50 Hours (AI other Hma) <br />K6 One Int ation Svedalist 41.20 <br />43.26 <br />182.00 75 Hours (Sam - 5pm, M -f) <br />K7 One litigation Laborer 25.75 <br />27.04 <br />181.00 50 Hours (Al glh4r Ames) <br />KS One Irrigation Laborer 25.75 <br />27.04 <br />Subtotal Section "K" Una No. 176 -163: <br />L EIQ UIPMENT <br />One Front End Loader wltn <br />184.00 <br />Backhoe, Including an Operator <br />(Hourly Rate) <br />LI <br />5 Hours <br />61,80 <br />64.89 <br />