Laserfiche WebLink
125 00 <br />Loading and Haling Debris from <br />Hourly Labor Rate <br />Pudic Property and Rightsaf-way <br />213.00 <br />M25 <br />(Wgetab" or coKtru[ticn debris) to <br />74,lt <br />77,0 <br />a Hnal Disposal Site per Cubic Yard <br />226.00 <br />in excess of 2S miles (Estimated <br />5,000 cubic Verdi) <br />M26 <br />Per Cubic Yard <br />I0.3 <br />S <br />f <br />M17 1 <br />Subtotal Section "M" lima No. <br />160 -126: <br />36.05 <br />1 <br />37.85 <br />214.00 <br />H18 <br />CollinsRed--by <br />INgpingl1rindling parCublc Yard <br />Per Cubic -,it <br />10. <br />$ <br />1081 <br />Removal of Hazardous Trees and <br />Limbs Work cordsts of removing and <br />placing diem at a City approved <br />location an the City ROW. <br />215.00 <br />6 inch to 23.99 inch diameter <br />M19 <br />Each <br />3D9.00 <br />5 <br />32445 <br />216.00 <br />M19 (A) <br />Continued - <br />24 inch to 35.99 111th diameter <br />Eacn <br />515.00 <br />540.75 <br />M19 (0) <br />Continued... <br />217.00 <br />36 inch and larger diameter <br />Each <br />927.00 <br />971.35 <br />Removal of Hazardous Stumps Rate <br />includes removal, backfill of stump <br />216.00 <br />hole, reducfian, and final disposal. <br />Sizes as blows: 24.1 Inch to 36.99 <br />Inch diameter <br />M20 <br />Each <br />It <br />515.00 <br />540.75 <br />219.00 <br />M20 (A) <br />37.1h 10 40.99 inch dlemeter <br />Each <br />616.0 <br />648,90 <br />220.00 <br />M20 (0) <br />49 inch and 18r2a diameter <br />Each <br />927.00 <br />$ <br />973.35 <br />221.00 <br />Generator, $00 0.W, List IN <br />Hourly Labor Rate <br />Capacity (Daily Rate) <br />M11 <br />103.00 <br />s108.!5 <br />222.00 <br />Wheel Loader, 3 CY, 152 HP <br />Haunt Labor Rate <br />(Including Operator) (Daily Rate) <br />M22 <br />133.9 <br />140.60 <br />Dozer, Tracked, D4 or Equivalent <br />223.00 <br />(Including Operator) <br />Hourty Labor Rate <br />M23 <br />Dai Rant <br />123.6 <br />$ <br />129.79 <br />Tub Grinder 90010 1,000 HP <br />224,00 <br />(IncluOing Operator) <br />Hourly Labor Rate <br />M24 <br />= Rao) <br />669.5 <br />702.98 <br />125 00 <br />Track, Flatbed(Includirg Operator) <br />Hourly Labor Rate <br />(Hourty Rate) <br />M25 <br />74,lt <br />77,0 <br />Dead Animal Car.-, Work <br />226.00 <br />consists of coectian, Hauling shp <br />final disposal at dead anmal <br />cartacses, <br />M26 <br />Pa ound <br />I0.3 <br />10.62 <br />Subtotal Section "M" lima No. <br />160 -126: <br />