My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2022-3432
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2022
>
Reso 2022-3432
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2022 4:11:49 PM
Creation date
12/19/2022 4:01:59 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2022-3432
Date (mm/dd/yyyy)
11/17/2022
Description
Approving an agreement w/ Breezeline, formerly Atlantic Broadband for conversion of overhead facilities to underground along Atlantic Blvd cooridor.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO: <br />VIA: <br />FROM: <br />DATE: <br />RE: <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br />(305),947-0606 City Hall <br />(305) 949-3113 Fax <br />MEMORANDUM <br />Honorable Mayor and City Commissioners <br />Stan Morris, City Manager <br />Paul Abbott, City Consultant <br />November 17, 2022 <br />Approve Agreement with Breezeline in the Amount for Conversion of <br />Overhead Lines Related to the Collins Avenue Undergrounding Project <br />RECOMMENDATION: <br />Staff recommends approval of this Resolution. <br />REASONS: <br />During the bid document preparation for the utility conversion project along Collins Avenue, it was <br />discovered that the low voltage conversion elements which run along Atlantic Blvd., and are inherently <br />critical to the Collins Avenue conversion, were inadvertently overlooked by the engineers. <br />As we approach the final completion of Phase 3 of the FPL transfer, which includes 175 Terrace to 183 <br />Street, the inclusion of the Breezeline (formerly Atlantic Broadband) overhead facilities must also be <br />removed. <br />Payment of $100,587.00 is required for Breezeline to perform this work to move our conversion <br />project forward to bring down the overhead lines and old poles. <br />ADDITIONAL INFORMATION: <br />After considerable review and negotiations with Breezeline, the cost proposal for this scope of work <br />was reduced from their original submission of $199,997.00 to $100,587.00. <br />ATTACHMENTS: <br />Resolution <br />Agreement: <br />Item Number: 10.0 <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.