My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2023-3480
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2023
>
Reso 2023-3480
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2023 4:12:02 PM
Creation date
3/31/2023 4:01:11 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2023-3480
Date (mm/dd/yyyy)
03/02/2023
Description
Ratifying 2nd Amendment and approving 3rd Amendment w/ The Corradino Group for Planning and Zoning Services.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE GORRADINO GROUP, INC. <br />ENGINEERS • PLANNERS • PROGRAM MANAGERS • ENVIRONMENTAL SCIENTISTS <br />July 25, 2022 <br />Mr. Jorge DeLaNuez <br />City of Sunny Isles Beach <br />RE: SIB Shuttle, Comprehensive Operations Analysis <br />This is a proposal to assist with a Comprehensive Operational Analysis of the SIB Shuttle. It is our <br />understanding that the City of Sunny Isles Beach desires to enhance the performance of its three <br />routes, (Orange Line #1, Orange Line #2, and Blue Line) so that they can operate at the highest <br />level, as well as explore other alternatives to boost ridership and minimalize automobile traffic. <br />This study will focus on increasing ridership, consider transitioning to, some extent, to demand <br />response service, examine route timing, days and hours of service, consider the benefits and <br />costs of an internal service vs an outsourced service, exploring other alternatives to automobile <br />mobility and finally, integrating with other cities, locations and services. In doing this it will be <br />important understand different traffic generators and hubs to help improve and revitalize the <br />current service routes, examine different service amenities that would make riders more <br />comfortable, to evaluate different emerging technologies like on demand service or first mile/last <br />mile service, as well as understand rider's needs. <br />Corradino will determine appropriate route alternatives and examine the potential locations of <br />new stops. An analysis of potential new route options will be undertaken to determine if <br />additional mobility and connectivity can be provided to other generators, such as schools, parks, <br />and shopping areas like in connection with Normal Edlecup Elementary (SIB K-8), as well as the <br />FIU Biscayne Bay Campus. The project will be supported by a detailed public engagement <br />campaign. <br />The following is a detailed scope of services, timeline and price. <br />Scope of Work <br />Task 1: Identify Existing Conditions, and Route Performance <br />Task 2: Alternative Routes <br />Task 3: Public Engagement <br />Task 4: Final Report <br />1055 tiW 9-TH AVENUE SUITE 200 • NIJAMI 1, 33178 <br />TEL 305.594.0735 • 800.887.5551 <br />FAX 305 59, x.;7.55 <br />bVWWCORRADI?iO COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.