Laserfiche WebLink
The purpose of the onboard passenger survey will be to generate a profile of the Orange Line #1, <br />Orange Line #2, and Blue Line Route passengers, determine origins and destinations, trip <br />frequency, customer satisfaction, and to document the need for additional services and service <br />coverage. The surveys will be conducted as passengers board the buses, by handing them a <br />survey to fill out as they ride or by asking questions one on one. Aside from handing surveys out <br />on the buses, a citywide survey will be made available. The survey will be a one page, check the <br />box instrument which will quickly assess pertinent information. <br />1.3 Review of other Circulators <br />Corradino will review the basic scheduling, funding and performance data for other circulators <br />within the region. This information will include number of routes, headways, hours and days of <br />operations, stop locations, cost per mile, cost per passenger. This data will be used to compare <br />the all three SIB Shuttle Routes with those services and assess the efficiency or effectiveness. <br />1.4 Review of External Conditions and System Operational Data <br />Corradino will examine roadway LOS across the city specifically around Norman Edlecup, <br />identify existing and potential future transit trip generators, Elementary, in conjunction <br />with staff, identify areas of potential interface with other transit systems, then geocode <br />each into a GIS database. This portion of the study will examine a cost analysis of the <br />current system, and an analysis between City operated or privately -operated transit. <br />The review of external conditions will identify different enhancements with the system, including <br />but not limited to connection points with services other services, on -board WiFi, and branding <br />opportunities. <br />Corradino will review all existing route data on ridership, cost, etc. for all three routes. This will <br />be used to supplement the analysis. <br />1.5 Intergovernmental Coordination <br />Corradino will coordinate with the surrounding cities and transit providers to understand better <br />the ability to link services and provide regional access where possible. <br />Task 2: Alternative Routes <br />Time Frame: Day 75-140 <br />Cost: $14,725 <br />Based on the review of roadways conditions, demographics and transit generators identified <br />during Task 1, up to two alternative routes structures for the system will be developed. Planning <br />level cost estimates will be developed for each option based on the operational and capital needs <br />of the route structure; if needed, the cost of additional vehicles and facilities will be included. <br />Each potential route will be mapped and displayed graphically. Preliminary schedule data will be <br />4055 NW 97TH AVENUE • SUITE 200 MIAMI. FL 33178 <br />TEL 305594.0735 • 800.3875551 <br />FAX 305.594.0755 <br />WWW.CORRADINO.COM <br />