My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Team Contracting Inc
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-02-01) East End of 172nd St Rdway & Drainage Improvements
>
Responses
>
Team Contracting Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2023 12:00:28 PM
Creation date
4/4/2023 11:59:16 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> T (305) 207-9799 . F (305) 207-9790 <br />13911 Southwest 42nd Street, Suite 209, Miami, FL 33175 <br />Bidder’s Role Project Name & <br />Location <br />Brief Description Of Work <br />Performed <br />Owner Contact Info. G.C. Project <br />Manager & <br />Superintendent <br />Original <br />Contract <br />Amount <br />Final <br />Contract <br />Amount <br />Project Start <br />Date <br />Project Status <br />General <br />Contractor <br />Annual Concrete and Paver <br />Stones – Project No. 12134 <br />Citywide Sidewalks and Pavers City of Fort Lauderdale <br />Engineering Department <br />Barbara Howell – Project <br />Manager II <br />954-828-4505 <br />Daniel Gell, PM <br /> <br />$1,600,000.00 $1,903,775.00 03/01/16 Completed <br />February 2020 <br />General <br />Contractor <br />Annual Concrete and Paver <br />Stones – Project No. 12517 <br />Citywide Sidewalks and Pavers City of Fort Lauderdale <br />Engineering Department <br />Jean Examond – Project <br />Manager II <br />954-828-4507 <br />Daniel Gell, PM <br /> <br />$1,800,000.00 TBD 04/07/20 TBD <br />General <br />Contractor <br />City of Sunny Isles Pelican <br />Community Center Repairs <br />New site fencing, stucco repairs, <br />painting, interior build-out <br />City of Sunny Isles <br />Richard Labinsky <br />City Engineer <br />305-792-1817 <br />Rodolfo Ayan, PM <br />Francisco Lopez, <br />Superintendent <br />$448,922.43 $515,895.64 05/11/20 03/19/21 <br />General <br />Contractor <br />Interior/Exterior Painting of <br />17th St. P.G. <br />Interior and exterior painting City of Miami Beach <br />Property Management <br />Jorge Guanchez <br />Daniel Gell, PM <br />Mario Lopez, <br />Superintendent <br />$164,480.00 $167,643.17 01/25/21 Completed <br />07/30/2021 <br />General <br />Contractor <br />New Baywalk & Seawall at <br />NE 22nd Street <br />Replace damaged seawall and <br />misc. site improvements <br />City of Miami <br />Capital Improvements <br />Roberto Fenton <br />Senior Project Manager <br />305-416-1002 <br />Rodolfo Ayan, PM <br />Francisco Lopez, <br />Superintendent <br />$302,630.73 $283,728.26 01/04/21 Completed <br />07/28/21 <br />General <br />Contractor <br />Structural Repairs for <br />Training Tower at Fire <br />Station 2 <br />Structural repairs throughout 6 <br />story training tower <br />City of Miami Beach <br />Property Management <br />Olga Sanchez <br />Daniel Gell, PM $124,500.00 $170,290.00 01/22/21 Completed <br />10/05/21 <br />General <br />Contractor <br />Lummus Park Elevation <br />Project <br />Regrading of 10 blocks beach sand City of Miami Beach <br />Property Management <br />Jorge Guanchez <br />Daniel Gell, PM $78,900.00 $78,900.00 04/23/21 Completed <br />05/12/21 <br />General <br />Contractor <br />Concrete Spalling Repair at <br />Fleet Management <br />(140 MacArthur Causeway) <br />Structural/Spalling repairs <br />throughout Fleet Management <br />facility <br />City of Miami Beach <br />Property Management <br />Olga Sanchez <br />Daniel Gell, PM $39,910.00 $62,660.00 05/24/21 Completed <br />07/16/21
The URL can be used to link to this page
Your browser does not support the video tag.