My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TFR Enterprises Inc
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-04-01) Disaster Debris Management and Disposal Services
>
Responses
>
TFR Enterprises Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2023 12:53:29 PM
Creation date
5/17/2023 12:48:02 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />a. Authorization to enter the property for demolition <br />b. Hold harmless agreement accompanied by a non-duplication of benefits agreement from the <br />City/County. <br />2. TFR crews are not permitted to enter private property except at the direction of the TFR ROE Manager <br />or Government Representative. <br />3. Proper completion of a TFR ROE Program Checklist: <br />a. HHW crew will be assigned to remove any hazardous materials from the property. <br />b. All HHW materials will be cataloged, and disposition defined. <br />c. All utility connections will be inspected to ensure that they are disconnected. <br /> <br />After demolition, all materials can be either placed on the right of way to be picked up under the debris removal <br />agreement or taken directly to the DMS for separation and disposal. <br /> <br />QC Rental of Equipment with Operators <br />1. Inspection and Identification of Equipment & Materials before any machinery or materials are <br />placed in use; they shall be inspected and tested by competent personnel. The Contractor’s personnel <br />will perform such duties. <br />2. The contractor’s personnel chosen by the Quality Control Officer will perform an inspection of all <br />machinery and materials daily. <br />3. Records of inspections shall be maintained at the site and shall be available on request. <br />4. Preventative maintenance procedures recommended by the manufacturer shall be followed. <br />5. All repairs on machinery or materials shall be made at a location, which will protect traffic for <br />repairmen. Any machinery or equipment found by the contractor to be unsafe shall be deadlined until <br />unsafe conditions have been corrected. <br />6. Only TFR-designated personnel shall operate machinery and mechanized equipment. <br />7. The Quality Control Supervisor shall instruct all operators in the use and details of Safety Operations. <br />8. Operators of machinery will establish and confirm requirements daily to comply with contract <br />documents with TFR’s representative. <br />9. Material deficiencies observed shall be reported to the proper TFR personnel for correction. <br />10. All safety procedures will be used by TFR’s Accident Prevention Plan. <br />11. All phases of work being performed will be inspected daily by the responsible member of the Quality <br />Control team. <br /> <br />ITB No. 23-04-01 <br />Disaster Debris Management and Disposal Services <br />107
The URL can be used to link to this page
Your browser does not support the video tag.